Text
s p reau
'YfC
[ ' 3.,., }h
<?
UNITED STATES NUCLEAR REGULATORY COMMISSION y
o a REGION 111 799 ROOSEVELT ROAD e
,g
GLEN ELLYN,lLLINOIS 60137 July 24, 1980 Docket No. 50-358 Cincinnati Gas and Electric Company ATIN:
Mr. Earl A. Borgmann Senior Vice President Engineering Services and Electric Production 139 East 4th Street Cincinnati, OH 45201 Gentlemen:
This will confirm the telephone conversation of July 24, 1980, between Mr. J. Schott and Mr. R. Warnick of my staff, that a meeting will be held between the NRC and several operating BWR licensees.
I have enclosed a copy of a sample letter sent to one of the affected licensees for your information. You are invited to attend this meeting; and you will not be required to make a presentation.
Please refer any questions you may have to Mr. F. Reimann of my staff.
Sincerely, em
^ ^ ::
^
F. Heishman, Chief Reactor Operations and Nuclear Support Branch
Enclosure:
RIII ltr to CECO dtd 7/24/80 w/mtg: schedule cc w/ encl:
Mr. J. R. Schott, Plant TIC Superintendent Harold W. Kohn, Power Siting Central Files Commission Reproduction Unit NRC 20b Citizens Against a Radioactive PDR Environment Local PDR Helen W. Evans, State of Ohio NSIC 0 09020 ll'7
'o UNITED STATES
~,,
8 NUCLEAR REGULATCRY COMMISSION 3,
g g
.s REGION lli 799 ROOSEVELT ROAD O[
Q, GLEN ELLYN, ILLINOIS 60137 o
July 24, 1980 Docket No. 50-10; 50-237; 50-249 Docket No. 50-254; 50-265 Docket No. 50-373 Consnonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
This will confirm the telephone conversation of July 24, 1980, between Mr. R. Janecek and Mr. L. Spessard of my staff, that a meeting will be held between the NRC, Commonwealth Edison Company representatives, and other operating BWR licensees at the Region III office, Glen Ellyn, Illinois on July 30 and 31, 1980.
The objective of the meeting will be to obtain an in-depth understanding
[
of the as-built scram discharge volume (SDV) and its piping including
)
the vent and drain valve arrangements and also including the instru-ment volume (s) in order to be in a position to review licensee recom-mendations for changes to the scram system to improve its operability I
l and reliability.
This will be a working level meeting whose primary purpose will be to gather knowledge and materials regarding the present as-installed con-figuration of the SDV system at each plant. No broad policy decisions trill be reached, and no decisions will be made at the meeting regarding acceptability of any licensees' SDV system or of proposed changes to that system.
Your attention is directed to the enclosure to this correspondence which provides a schedule for each licensee's presentation.
To obtain the desired in-depth understanding, we will want to meet separately with each operating BWR licensee to discuss the as-built valve arrangement, scram discharge voltune, piping, and instrument volume (including pneumatic, hydraulic and electrical subsystems). Each session is scheduled for approximately 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.