/U
UNITED STATES
T
8'
o$
NUCLEAR REGULATORY COMMISSION
3
E
REGION 11
-
3'f
o,
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 303o3
JUL 151980
In Reply Refer To:
RII:RMC -
.
50-338/80-28
s
50-339/80-2
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by R. M. Compton of this office on
June 16 through 18, 1980 of activitics authorized by NRC License Nos. NPF-4 and
NPF-7 for the North Anna facility, and to the discussion of our findings held
with E. W. Harrell at the conclusion of the inspection.
Areas examined during the inspection , and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective exaninations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.q
C. E. Murph , Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
8008280 2N
)
.
Virginia Electric and Power Company
-2-
Enclosure:
Inspection Report Nos. 50-338/80-28
- and 50-339/80-27
4
,
cc w/ enc 1:
W. R. Cartwright, Station Manager
P. G. Perry, Senior Resident Engineer
.
N. B. Cleveland, Vice President-Quality
Stone and Webster Engineering, Inc.
l
t
i
e
l
- l
1
i-
!
>
$
t
-n-
. . . . , - .-- ..,~.,
..e.--
- ,
-,e,
e
,
- , - - --- - - . . . . - - - -
r,
a-wn. . .
-n.,
ee...,,..e,,w.--
- , ---e
.w,
, ---
e..m.,
_., - - - - - - , . .