ML19344E151

From kanterella
Jump to navigation Jump to search
Forwards LER 80-115/03L-0
Date released: 12/24/2019 Download: ML19344E151


LER 80-115/03L-0:on 800727,while in shutdown,2C Diesel Generator Failed to Tie & Supply 4,160-volt Bus 2G.Caused by Instrument Setpoint Drift.Relay Recalibr & Surveillance Performed W/Satisfactory Results
ML19344E152
Person / Time
Site: Hatch 
Issue date: 08/20/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344E152 (2)
Forwards LER 80-115/03L-0
ML19344E150
Person / Time
Site: Hatch 
Issue date: 08/20/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344E150 (1)