LER 80-120/03L-0:on 800811,during Normal Steady State Power Operation,Recirculation Pump 2B Rx Tripped on Low Oil Pressure to Mg Set When Dc Control Power Was Lost to Mg Set Oil Pumps.Caused by Failure to Restore Normal Dc Power
ML19344E088
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/21/1980
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344E082 List:
References
LER-80-120-03L, LER-80-120-3L, NUDOCS 8008260611
Download: ML19344E088 (2)


Text

"NHC FOHM 3GG (1 77) ,

LICENSEE EVENT REPORT CONTROL BLOCK: l i

l l l l l lh o

(PLEASE PRINT OR TYPE ALL HEOUIRED INFORMAllONI lo lil 14

@l0l0l-lOl0!010lOl-l0101@l4l1l111lIl@l lb LICENSE NUh*BLl4 23 26 LICLNSE TYPE Ju l

Sr 4 AI a.s l@

7 8 LICENSEE CODE COM'T l0lil $$$lLl@l0l510!010131616 l@l0 18EVENT 68 fM 11 DATE 11 18 10 l@l0l8l2l1l8l0j@

74 h REPORT DATE 80

?- B 60 GI DOCKET NUMDEH EVENT DESCnlPTION AND PROB ABLE CONSEQUENCES During normal sleady state power operation. while maintenante personnel i o 2 l Io lal l were investigating the cause-of a DC battery ground on the 2B Station I l o 141 l Service Batteries, the 2B Rx Recirc Pump tripped on low oil pressure to J f o lsi i the 14G Set when DC control power was lost to the f4G Set Oil Pumps. I io is ; i There were no effects upon public health and safety due to this I

';/ent. 1 lo I7I I .

I Lo_id i w D CODE St BC E COMPONENT CODE SUBC dE S DE lol9] lC lB l@ [D_j@ (_Z l@ l Z l Z l Z l Z l Z l Z l@19lZ l@ LZj 20 9 10 11 12 13 18

/ 8 SEQUENTI AL OCCURRENCE HEFORT HEVISION EVENT YEAR REPORTt 3. CODE TYPE N O.

LE R PO

@gg _ l21810l 22 l-l 23 l1l2l0l 24 26

[/_J 27 l0 l3 l 28 29 l Ll 30 l-l 31 l0 l 32 ON PL/ NT P ET 4 HOURS 22 S P ITT F Rt i bt,B. S PPLI MAf L)F ACT MER AKE A O I Hi@LZ.j@ lBig l3uZl@

l0l0l1l 3/

l 40 lY lg lY lg lZ lg lZ l9 l9 l9 lg.

41 42 43 44 47

, 33 34 35 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS IiIo I l The cause of loss of DC control power to the 14G Set Oil Pumps was failure l i i I to rutore normal DC control power before turning off the alternate supply. i

, 2 1 Personnel have been cautioned to have normal DC power restored before turning i iii3i l off the alternate supply when checking for battery grounds. l I

l i l41 1 80 7 8 9

% POWE R OTHER ST ATUS ISC V H DISCOVEHY DESCHIPT60N STA S Operator Observation l Ii I5 l l E l@ l 110l 0l@l N/A l lAl@l ACTIVITY CONIENT AMOUNT OF' ACilVITY LOCATION Or HFLE ASE FtElf ASED Or HELF ASE i r. j Z j @ LZ_J@l N/A l l It/A l

' rEnsONNcl nrosur'iES NuvoE n n PE cESeniPTiON @

N/A l i i 1010 l 0 l@l Z l@l ""

PEnSONNEl'mvifir$

) Nuest n otSCniPnON@ l i n 10l0'l0l@l N/A 80 1 8 9 11 12 t OSS Or on O AYAGE 10 F ACIl.I TY [

TYPE tie SCitt Pi t ON V fl/A l 1

i 9 H 9 W @l10 80 L St.;lltP1 t ON

~' o 1sstf(fI@l

[J.L N/A l lllllllllllll}

"a a na "

, n u iu 8 00826" Wil S. X. BaXley, Supt. of Operations pggyg.912-367-7781 f, NAML Of PHEPAHER _ _ _ _ _ . _ . _ _ _ _

NARRATIVE REPORT Georgia Power Company Plant E.I. Hatch P.O. Box 442 Baxley, Georgia 31513 During normal steady state power operation maintenance personnel were investigating the cause of a battery ground on the 2B Station Service Batteries. This was being done by cutting off circuit breakers in DC Cabinet 2R25-5002, and checking each circuit for ground indication.

The normal DC power supply to the 2B Recirc MG Set had had been turned off. This caused transfer of DC control power to the alternate supply.

The power was then turned back on to the norraal supply, however transfer back to nonnal from alternate is a manual transfer, which has to be performed locally at the MG Set. An operator was sent to the local panel to transfer the DC supply back to normal, however before the Operator had perfonned this transfer maintenance personnel turned off the alternate supply breaker. This caused loss of DC control power which caused the AC Oil Pumps to trip which tripped the MG Set on low oil pressure. Personne, have been cautioned to insure that normal DC power is restored before turning off the alternate supply, when checking for battery grounds in the future. The normal DC power ucs restored and the 2B Recirc MG Set was returned to service. This is a non-repetitive occurrence.

l

- . - -