ML19344D962

From kanterella
Jump to navigation Jump to search
Forwards LER 80-034/03L-0
Date released: 01/03/2020 Download: ML19344D962


Forwards LER 80-034/03L-0
ML19354C349
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/19/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19354C349 (1)
LER 80-034/03L-0:on 800804,during Insp of Snubbers on Safety Sys,Pt 19.6.0.1,Bergen Paterson snubber,1B21-70155184,found Overextended.Caused by Loose Pipe Clamp.Clamp Repositioned & Tightened
ML19344D961
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/19/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344D961 (1)