O Wisconsin Electnc mcoumr 231 W. MICHIGAN, P.O. BOX 204E, MILWAUKEE, WI 53201 August 22, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. Robert Clark, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET NO. 50-266 STEAM GENERATOR INSPECTION PROGRAM POINT BEACH NUCLEAR PLANT, UNIT 1 Mr. Edson G. Case's letter dated August 8, 1980, permitted the resumption of operation of the Point Beach Nuclear Plant Unit 1 following the shutdown of the unit on July 25, 1980, for steam generator hydrostatic testing and eddy current inspection.
The letter requested that we inform you of our plans and schedule for steam generator tube inspections during the November 1980 outage.
Our present plans are to take Point Beach Unit 1 out of service on November 7, 1980.
During this outage we will conduct a 100 percent multifrequency eddy current inspection of all unplugged tubes in both steam generators up to the first support plate from the hot leg side.
A random sample of 3 percent of the tubes will be inspected from the hot leg side over their entire length.
Should you have any further questions regarding our steam generator tube inspection plans, please notify us.
Very truly yours,
? [V'
{/L a
C. W. Fay, Dire \\
ctor Nuclear Power Department Subscribed and sworn to before me This 22nd day of August, 1980.
f G
M. diadw S
Notary PubFic, State of Wisconsin
/)c)
My Commission expires
- )-f-[(M Copies to: Mr. C. F. Riederer (PSCW)
Mr. Peter Anderson (WED) l Ms. Joan Estes (LSCFSE) l 80062603 70
_