U.S. NUCLEAR REGULATORY CCM1ISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900295/79-01 Program No. 51400 Company: Westinghouse Electric Corporation Power Electronics & Drives Systems 4454 Genesee Avenue Buffalo, New York 14240 Inspection Conducted: December 12-14, 1979

/[/f/88 Inspectors:

/

p J./J. Ageef Contractor Inspector Date ComponentsSection II Vendor Inspection 3 ranch Approved by:

8 uEwM

/ /d TO D. M. Hunnicutt, Chief

/

Date ComponentsSection II Vendor Inspection Branch Sumenrv Inspection on December 12-14, 1979 (99900295/79-01)

Areas Inspected: Imple=entation of 10 CFR 50, Appendi:c 3 criteria, and ap-plicable codes and standards, including:

Initial Management Meeting, QA Manual / Program, Design Review / Production Testing.

The inspection involved twenty (20) inspection man-hours on site.

Results: Within the areas inspected, no deviations or unresolved items were identified.

1 i

l

)

80081gg QQj

]

i 2

DETAILS SECTION A.

Persons Contacted

)

- W. T. Buonaccorsi - Applications Engineer, Manager

  • R. W. Gardner - Marketing Manager
  • D. M. Hawkins - Quality Assurance Manager E. J. Kaj das - Quality Control Supervisor
  • E. M. Sch=idt - Assistant to General Manager
  • J. Tomchinsky - Quality Control Manager J. E. Trost - Division Marketing Representative
  • Attended exit interview.

B.

Initial Management Meeting 1.

Obj ectives The obj ectives of the Initial Management Meeting were to:

Meet the Westinghouse, Power Electronics and Drive System (PEDS) a.

Division senior management personnel and acquaint them with the NRC responsibility to protect the health and safety of the public.

b.

Inform them of certain responsibilities imposed on vendors by the Energy Reorganization Act of 1974 (Public Law 93-438).

c.

Acquaint them with the NRC Vendor Inspection Progran (VIP).

d.

Learn how the company operates and its policies and practices concerning quality assurance (QA).

Obtain information relating to the company's contribution to e.

the nuclear industry.

2.

Method of Acccmplishment The preceding objectives were accccplished by:

Discussing tha NRC organizational structure including the a.

responsibility of the Vendor Inspection Branch with senior management.

b.

Explaining how inspections are conducted and how inspection results are documented.

W

3 c.

Explaining that all reports and ce=nunications are placed in the Public Document Room (PDR).

d..

Explaining the publication and function of the " White Book."

e.

Requesting company's management to explain policies and practices concerning quality assurance and how the division is structured within the Westinghouse corporate organization.

f.

Requesting the ccmpany's management to provide a summary of the ecmpany's operations, its centribution to the nuclear in-dustry and management's involvement to ansure successful im-plementation of its QA program.

3.

Results The company's management was attentive to the presentation of a.

the Vendor Inspection Pregram and the publication of the

" White Book."

b.

The QA/QC Managers explained how the QA/QC staff is structured within the division and the Westinghouse Buffalo complex and how the division management is involved in implementing the QA progrzn.

The QA/QC managers explained the division is a supplier of c.

multiple electrical / electronic products including inverters, rectifiers and motor drive controllers for cranes, bridges, steel mills.'

The only product sold and designated for use in the commercial nuclear industry is a 7.5 K7A static inverter which is sold to one (1) customer, the Westinghouse Nuclear Energy Systa=s Division (WNES).

l The invertors are built fr== standard cennercial c==ponents and are not qualification tested to meet applicable standards i

for Class 1 applicaricus.

The customer, WNES, had retained

]

the responsibility for final qualification testing of the inverters to meet applicable : odes and standards for Class 1E applications for the commercial nuclear industry.

l C.

Quality Assurance Manual / Program 1.

Cbjectives The objectives of this area of the inspection were to verify that:

a.

A quality assurance manual / program had been imple=ented in~

compliance with custcmer and/or 10 CFR 50 Appendix B criteria.

4

.b.

Written procedures had been i=plemented describing how quality functions are satisfied.

c.

Persons and organizations performing quality assurance func-tions reporr to a management level such that required authority and organizational freedom are sufficient to adequately enforce the quality progras.

d.

A system of planned and periodic audifts have been implemented.

e.

Nonconfor=ing items are examined for disposition.

f.

Training concerning quality assurance practices and programs are provided to personnel whose activities affect quality.

2.

Method of Accomolish=ent The preceding objectives were accomplished by:

Review of the QA Manual and discussions with the QA/QC =anagers a.

concerning the PEDS implemented QA Manual / Program which revealed the QA Manual and several procedures in the QC Manual are cur-rently in revision draft.

b.

Review of the following sections from the QC Manual:

(1)

Section 4.0, Receiving Inspection.

(2)

Section 5.0, In-Process Inspection and Test.

(3) Section 6.0, Final Inspection and Test.

l l

(4) Sub-Section 7.3, Manufacturing Process and Assembly.

Verified by inspection of the Receiving Inspection, In-Process c.

Inspection and Test, Final Inspection and Test, and Manufactur-

)

ing Process and Assembly areas that the related QC functions are conducted in compliance with the QC Manual sections listed,

)

above.

1 d.

Review of the QA/QC organizational structure and detersined the quality depart =ent reports to a level of =anagement such that required authority and organi:ational freedom are provided for them to be independent from costs and production schedules.

l Review cf the audit progras by examining the product audit l

e.

files which are listed below by date and product / shop order numbers:

5 (1) 1/22/79, Go #DA-72586 So #30K2312-2 (2) 8/29/79, GO #IW-65708 SO #30K2397-1 (3) 8/30/79, GO JNY-87409 SO #30K2401 (4) 12/6/79, Go #IN-25138 50 #30K2367 (5) 12/6/79, GO #3S-72329 50 430K2365 f.

Examining audit records of the following audits - listed by date and area:

(1) 1/4/79, Receiving Inspeccion (2) 1/10/79, M-20 (print circuit board asse=bly)

(3) 1/17/79, W-67 (module assembly area) g.

Examining the records of the three (3) qualified auditors for PEDS.

h.

Discussions with QC manager regarding data failure analysis reports that are compiled en non-conforming parts, materials,

ccmponents, sub-assemblies, etc., for identification, evalu-ation and/or correction of deficient quality products and/or functional areas.

1.

Review of QA department training records program and for management and supervisory people whose activities affect quality.

j.

Discussions with QC Manager regarding ? IDS position on 10 CFR part 21, 3.

Findings Within this area of the inspection, no deviations or unresolved items were identified.

Comments a.

Although management displayed nu=erous training schedules and training programs available for Westinghouse management i

l

)

l

6 personnel, no records were exmnined indicating that training programs had been conducted for nonsupervisory personnel whose activities affect quality, such as engineering, procurenent personnel. Those records, if available, will be examined in a subsequent inspection.

b.

PEDS has discontinued the practice of imposing 10 CFR Part 21 on its suppliers since the only product they (PEDS) manufacture for the commercial nuclear industry is supplied to one (1) customer, only.

This product, a 7.5 KVA static inverter, is manufactured from standard commercial stock products for the Westinghouse Nuclear Energy Systems Division. WNES contrac-turally retains the responsibility for final design approval, design change approval and final qualification testing of the inverter to meet applicable national codes and standards. WNES also examines production test data, burn-in data and QA data packages before granting release for shipment of static inverter products.

D.

Design Reviev/ Production Testing 1.

Objectives The objectives of this area of the inspection were to:

(a) Review customer procurement documents for PEDS design and production of static inverters for Class lE applications.

(b) Determine what design, codes, standards and test qualification i

requirements are imposed on PEDS for static inverters for Class lE applications.

(c) Determine what type qualification, production and/or environ-

=ent testing is conducted by PEDS in the productian of static inverters.

(d) Determine what design, productiun, testing specification or a

1 procedures have been implemented by PEDS for the production of static inverters.

2.

Method of Acc:molishment The preceding objectives were accomplished by:

a.

Discussions with =arketing and applications engineering per-sonnel regarding the design. production testing, and documenta-tion requirements for static invertars provided for WNES.

.l

7 b.

Review of the custo=er (WNES) purchase order No. 546-GLP-248606, September 8,1976, (PEDS G.O. No. Ed-50036-AR6/L13) for four (4) 7.5 KVA Static Inverter Power Supply Systems.

Applicable Specifications referenced in the P.O. referenced above includes, WNES Specification G676573, Revision 5, en-titled, " Statics Inverter Power Supply System for Critical Single Phase Loads" dated March 13, 1975.

Review of~EEDS test data raport entitled, " Environmental Test c.

of 7.5 KVA Instrument Bus Inverter," dated June 22, 1978.

This test data, accumulated during a test conduc ted April 10-14, 1978, of a 7.5 KVA inverter, style No. 1738A94G12, assembled by PEDS order No. 30K2203-1, was authorized by WNES P.O. No.

546-LP-265708-SN for the environmental qualification of the generic static inverter for WNES for Class lE applications, d.

A review of production practices and test programs from the receipt, inspection and testing of incoming products to storage in stock, assembly of product kits, stuffing of printed circuit (?C) boards, pre-and post-inspection of soldered PC boards, functional testing of PC boards, assembly and testing of inverter modules, assembly of modules into in-verter cabinet and final functional testing of the inverter, including review a one hundred (100) hour burn-in test of an inverter that was in progress.

Activities at each produc-tion, inspection, assembly and test stations were being per-formed in compliance with applicable procedures which were available for review.

3.

Findings Within this area of the inspection, no deviations or unresolved items were identified.

Comments J

a.

PEDS completed the basic design for the inverter, which is manufactured for WNES, in 1972.

The design was approved and frozen by WNES. All subsequent design changes require WNES

approval, b.

PEDS provides certified production tests for each inverter including a one-hundred (100) hour burn-in test.

PEDS is not contractually liable for the full qualification testing of the static inverters to meet Class lE applications.

According to-PEDS engineering and QA personnel "WNES has retained the responsibility for full qualification testing of the PEDS static inverters to meet applicable codes and standards i

f or Class lE applications. "

G *,

8 The WNES Equipment Specification G676573, Revision 5, imposed c.

on PEDS by the WNES P.O. No. 546-GLP-248606 (reference para-graph 2.b) does not require PEDS compliance to IEEE standards 323, and 344 for qualification and seismic testing, respectively, for static inverters.

E.

Exit Interview Uh The inspector met with =anage=ent representatives denoted in paragraph A. above at the conclusion of the inspectica on December 14, 1979.

The inspector summarized the scope of the functions that were inspected including:

1.

Initial Management Meeting 2.

QA Manual / Program 3.

Design Review / Production Testing Management acknowledged the con =ents made by the inspector.