Forwards QA Program Insp Rept 99900295/79-01 on 791212-14. No Noncompliance Noted
ML19344D400
Person / Time
Issue date: 01/16/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hoover G
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19344D401 List:
References
REF-QA-99900295 NUDOCS 8003120285
Download: ML19344D400 (2)


Text

__ _ _ - _ _ - - -

s. g

( i N ;t LA

+

\\

UNITED STATES i

s>* " 5009

'~U

  1. p 4,

NUCLEAR REGULATORY COMMISSION gy, REGloN IV

^

3 e

1 2,

0 611 RY AN PLAZA oRIVE, SUITE 1000 f

ARLINGTON. TEXAS 76012 3 3 s./ #

16 JAN 1c80

..../

Docket No. 99900295/79-01 Westinghouse Electric Corporation Power Electronics & Drives Systems Atta: }ir. G. O. Hoover General Manager 4454 Genesee Ave.

Buffalo, New York 14240 Gentlemen:

This refers to the QA Program inspection conducted by Mr. J. R. Agee of this office on December 12-14, 1979, of your facility at Buffalo, New York, associated with the =anuf acture of electrical / electronic products and to the discussion of our findings with you and members of your staff at the con-clusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively i=plemented.

The inspection effort is not designed to assure that unique quality require =ents i= posed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your custcmers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibilit.y for the quality of specific products, components or services procured from others. You should therefore not concluda that the NRC's inspection exe= pts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an enmination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.

80 0312e ogg

f Westinghouse Electric Corporation 2

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any infot=ation that you believe to be proprietary, it is necessary that you make a written application within thirty

-(30) days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor=ation identified in the application is contained in a separate part of the doct:=ent.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Rocm.

Should you have any questions concerning this inspaction, we will be pleased to discuss them with you.

Sincerely, O

JJ20 w

Uldis Potapovs, Chief Vendor Inspection Branch

Enclosure:

Inspection Report No.

99900295/79-01 1