ML19344D321

From kanterella
Jump to navigation Jump to search
Forwards LER 80-007/03L-0
Date released: 12/24/2019 Download: ML19344D321


LER 80-007/03L-0:on 800204,when Plant Batteries Were Placed in Equalize,Steam Leak Detection a Logic Topaz Inverter, Model 125-GW 12560,tripped.Caused by Improper Setting on Inverter High Voltage Trip.Inverter Trips Recalibr
ML19344D324
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/04/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344D324 (1)
Forwards LER 80-007/03L-0
ML19344D320
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/04/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344D320 (1)