O OPERATING DATA REPORT DOCKET NO.
050-0298 DATE 3-6-80 COMPLETED R*/
P.
L. Ballinger TELEP:iONE An9_a m,811 OPERATING STATUS
- 1. Unit Name:
a n n a r h 1aar
- hn Februarv 1980
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe).
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
None This Month Yr..to Date Cumulative 696 1440 49,681.0
- 11. Hours In Reporting Period 696 1425 42,662.3
- 12. Number Of Hours Reactor Was Critical 0
0 0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 696 1415.7 41.891.1
- 15. Unit Reserve Shutdown Hours 0
0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,531,536 3,012,622 79.220,742 506,142 1,006,556 25,545,404 17 Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 487,658 969,947 24,628,224
- 19. Unit Service Factor 100.0 98.3 84.3 100.0 98.3 84.3
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 91.7 88.2 64.9
- 22. Unit Capacity Factor (Using DER Net) 90.1 86.6 63.7 0.0 1.7 4.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
Refueline and Maintenance. March 1,1980, een weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
- 26. Units in Test Status (Prior to Commercial Opu.cion):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8oosno 6S8-=>
I i
i WERAGE DAILY UNIT POWER LEVEL 050-0298 DOCKET NO.
4 UNIT Cooper Nuclear Stacion J
DATE 3-6-80 f
COMPLEED BY P. L. Ballinger 402-825-3811 TELEPHONE l
MONTH February 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net)
(MWe-Neti 666 I
37 565 2
661 ig 707 581 714
)
3 39 725 4
20 709
)
707 5
749 21 6
738 22 704 7
742 23 698 8
739 24 692 729 9
25 701 4
10 711 696 26 694 13 728 27 12 724 23 692 13 724 690 79 720 14 30
-~~
710 15 31 709 16 3
4 INSTRUCTIONS On this A,rmat !ist the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megswatt.
(4/77)
050-0298 DOCKET NO.
UNITSilUTDOWNS ANilPOWER REDUCTIONS UNIT NAME Cooper Nuclear Station DATE 3-6-80 COMPl.ETED BY P-T__
Rn 11 1 n oa r REPORT MON 111 Wh - ry 1980 1ELEPHONE 402-R75 ~1A11' E
E
,kj h
_ Yh 1.itensee
{4, c1, Cause & Corset live No.
Date g
3g s
.3 g 5 Event u?
Attiini to F
$3 55C Mepost #
$U O
Pievent Recurrence o
U e
6 80-4 800117 S
0 11 4
N/A N/A N/A Power was reduced to allow adjustment of the control rod pattern.
l I
2 3
4 l
17: l orced f.eason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failuse(Explain) l-Manual for Pseparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for I.icensee i
C-Refueling 3 Automatic Sesam.
Event Reporn (1.1 R) File INilRIG D-Regulatusy Restriction 4-Olher (Explain) 01611 E-Operator Training & ljcense Examination l' Administrative 5
G Operational Euros (l'.xplain)
Eshibit I - Same Source 19/77)
Il-Other (Explain)
Cooper Nuclear Station Refueling Information Request Enclosure to Monthly Operating Report February ' 1980 1.
Facility - Cooper Nuclear Station 2.
Scheduled Refueling S/D - March 1, 1980 3.
Scheduled Refueling S/U - May 15, 1980 4.
License amendment required? - Yes a.
The Rod Block Monitor setpoint and operating Minimum Critical Power Ratio (MCPR) limits are being revised.
b.
A Maximum Average Linear Heat Generation Rate Curve was added for prepressurized fuel.
c.
The bellows leakage detection switches were removed from safety relief valves.
5.
License Document Submittal - February 18, 1980 - Reload Licensing Submittal - NEDO 24230 and Proposed Technical Specifications 6.
New licensing considerations - None 7.
Fuel assemblies currently (a) In Core - 548 (b) Spent Fuel Storage - 508 (includes 112 new fuel assemblies) 8.
Licensed spent fuel storage capacity - 2366 assemblies 9.
Last discharge assuming present capacity - 1996 h
9 I
N 4
y
- l.. _
Cooper Nuclear Station Operations Narrative February 1980 The reactor operated the month of February with no unscheduled power outages at a capacity factor of 86.6%.. A scheduled power reduction was made on February 17, 1980 to allow adjustment of the control rod pattern.
i I
h
.I 4
9
^
r 8-
~k
- +
_. _