LER-1979-046, During Surveillance Testing,Diesel Generator 1-1 Began Making Loud Noises & Was Declared Inoperable.Caused by Bearing Failure in Turbocharger.Turbocharger Replaced |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3461979046R03 - NRC Website |
|
text
_ -_
- 14. S. NUCLE AR REGULATORY COMMISSION NRC FORM 3C6 [7 77)
LICENSEE EVENT REPORT CONTROL BLOCK: l l
l l
l l
(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l l
6
- o l t l l 0 l H l Dj Bl Sl 1l@] O l 0 l-l 0 l 0 l N l P lF l-l0 l 3 ]@l4 l1 l1 l1 l 1 l@l l
l@
l 8 9 LICENSEE CODE 14 15 LICENSE Nbr.*ULH 25 26 LICENSE TYPE 40 bl GAI $d i
CON'T Dlil S$"CE l L @l 0 j 5 l 0 j - l0 l 3 l 4 l 6 @l 013 l 3 l0 l 7 l9 l@l9 l4 l2 l517 l9 l@
8 60 61 DOCK ET NUMBER 6d 69 EVENT DATE 74 75 REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h O 12 I l At 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on March 30, 1979 during surveillance testing, Diesel Generator 1-1 be-J gan making loud unusual noises and was thereby decla ed inoperable. This placed the l O la1 l
, o ;4 l l unit in the Action Statement of Technical Specification 3.8.1.1.
Surveillance requir4-ments were fulfilled by proving the operability of the independent of fsite AC l
- o Isl l t o l6 ] l electrical power Sources and by demonstrating the operability of the remaining l
- ol7ll Diesel Generator 1-2.
There was no danger to the health and safety of the public or l 3 ois ; ; unit personnel. The above surveillance requirements were performed successfully.
I 7
8 9 (NP-33-79-49)
'o'E S sCOSE COMPONENT CODE SUBC DE SU E
Co C0DE lE lE l@ l El@ ]@ l B l Ll 0 [ Wl E l R l@ lZ l@ lZ l@
io191 7
8 9
10 11 12 13 18 19 20 t
SEOUEN TI AL OCCURRENCE REPORT REVISION g
LE R /RO EVENT YF AR REPORT NO.
CODE TYPE N O.
@ Njgt I 71 91 l--I I 0 14 I 61 M
10131 IL I B
W a
_ 21 22 23 24 26 21 28 73 Ju 31 32 KEN AC C ON PL NT M T H URS 22 SB I D
FO EUB.
$ PLI E MAN FACTURER A@
lZ l@
l Zh l N lflO l l
l Y l@
lYl@
lAlg lBl4l8lSlg
@l l
33 34 35 36 3/
40 41 42 43 44 47 I
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS gigoll Diesel Generator 1-1 was declared inoperabl.e due to a bearing failure in the turbo-l g,g,l l charger. The entire turbocharger was replaced, and Diesel Generator 1-1 was declared l g,,,,l operable at 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> on April 1. 1979. Power Encineerina is to evaluate Pouer 1
4
,,l3; l Systems' recommendations on improving turbocharger reliability.
l til41l 80 1
8 9 ST S
% POWER OTHE R STA TUS IS OV HY DISCOVERY DESCRIPTION I115 l l El@ l 0 l 7 l 3 l@(_,MA l
W @l Surveillance Test ST 5081.01 l
6 A TIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION oF RELEASE It1l6l W @ (_Z_j@j NA l
l NA l
PERSONNEt ExPOSOES NUMBER TYPE
DESCRIPTION
NA Itil2ll0l0101@[_Zj@l
,ERSONNELimuh5 DESCniPTiON@
NuveER tilall0l0l0l@l NA l
l 1 8 9 11 12 80 LOSS OF oH DAVAGE TO FACILITY h 8003110[3?
I l
TYPE
DESCRIPTION
' I i l 9 l [Z_j@l NA 1
8 9 10 PUBLICITY NRC USE ONLY 40 l NA
! !!!!!!!II!!!l%5
, $ 2 l o l W@ DESCRIPTION ISSUED 68 69 80 5 l 7 8 9 10 419-259-5000. Ext. 253 2,
John P. Hartinan PHONE:
~DVR 79-059 NAVE OF PREPARER
f f
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-49 DATE OF EVENT: March 30, 1979 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Emergency Diesel Generator 1-1 declared inoperable due to turbocharger failure The unit was in Mode 1, with Power (MWT) = 2023, Conditions Prior to Occurrence:
and Load (Gross MWE) = 665.
Description of Occurrence: At 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on March 30, 1979 during the conduct of ST 5081.01, " Diesel Generator Monthly Surveillance Test", Diesel Geaerator 1-1 started making loud unusual noises. Diesel Generator 1-1 was declared inoperable, Tech-
. placing the unit in the Action Statement of Technical Specificatica 3.8.1.1.
nical Specification 3.8.1.1 requires both independent diesel generators be opera-ble while the unit is in Modes 1, 2, 3, and 4.
The Action Statement requires veri-fication of the remaining AC sources by performance of Surveillance Requirements 4.8.1.1.la and 4.8.1.1.2.a.4.
Surveillance Requirement 4.8.1.1.1.a, which deter-mines the operability of the independent circuits between the offsite transmission network and the onsite Class.lE distribution system at least once in seven days, was fulfilled by ST 5080.01, " Independent Of f-Site AC Sources Lined Up and Availa-ble".
Surveillance Requirement 4.8.1.1.2.a.4, which demonstrates the operability of the remaining Diesel Generator 1-2 with a start from ambient condition and
. acceleration to at least 900 RPM in fE10 seconds, was fulfilled by ST 5081.01,
" Diesel Generator Monthly Test".
Both requirements were successfully completed within one hour of the failure.
Designation of Apparent Cause of Occurrence: The turbocharger malfunction resulted from a turbocharger thrust bearing failure as reported by the vendor, Power Systems.
Analysis of Occurrence: There was no danger to the health and safety of the public or to unit personnel. Diesel Generator 1-2 proved operable and station personnel performed the necessary surveillance requirements as detailed by the Action State-ment of Technical Specification 3.8.1.1.
' Corrective Action: Under Maintenance Work Order 79-1788, the turbocharger unit was
. removed and replaced with a spare. Diesel Generator 1-1 was verified operable by the successful performance of ST 5081.01, " Diesel Generator Monthly Test", at
.1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> on April 1, 1979. Power Engineering is to evaluate Power Systens' J
1 recommendations on improving turbocharger reliability.
LER #79-046 u_
(.
i a.
e f TOEDO EDISON : COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL'INFORMATION FOR LER NP-33-79-49 PAGE 2 Failure Data: One previous turbocharger failure -occurred on February 8,1978_ -
see Licensee Event Report NP-33-78-21.
LER #79-046 1
l i
1 i
-~
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000346/LER-1979-001-03, /03L-0 on 790102:monthly Functional Test Not Performed on Reactor Protection Sys Channel 2 within Allowable Time.Caused by Breakdown in Communications Between Testing Personnel & Test Coordinator | /03L-0 on 790102:monthly Functional Test Not Performed on Reactor Protection Sys Channel 2 within Allowable Time.Caused by Breakdown in Communications Between Testing Personnel & Test Coordinator | | | 05000346/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000346/LER-1979-002-03, /03L-1 on 790102:main Steam Valves 106 & 106A Failed to Open,Resulting in Auxiliary Feed Pump Afp 1-1 Being Taken Out of Operation.Caused by Dirt Buildup on Valve Stems as Result of New Const | /03L-1 on 790102:main Steam Valves 106 & 106A Failed to Open,Resulting in Auxiliary Feed Pump Afp 1-1 Being Taken Out of Operation.Caused by Dirt Buildup on Valve Stems as Result of New Const | | | 05000346/LER-1979-002, Forwards LER 79-002/03L-1 | Forwards LER 79-002/03L-1 | | | 05000346/LER-1979-003-03, /03L-0 on 790104:control Room Emergency Ventilation Sys Damper HV5311E Inoperable.Caused by Leaking Pneumatic Operator.New Operator Installed.Damper Operated & Tested for Response Time & Declared Operable | /03L-0 on 790104:control Room Emergency Ventilation Sys Damper HV5311E Inoperable.Caused by Leaking Pneumatic Operator.New Operator Installed.Damper Operated & Tested for Response Time & Declared Operable | | | 05000346/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000346/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000346/LER-1979-004-03, /03L-0 on 790105:failure to Post Guards at Entrance to Containment During Periods of Free Access. Caused by Personnel Error.Special Order 84 Revised to Require Posting of Guards | /03L-0 on 790105:failure to Post Guards at Entrance to Containment During Periods of Free Access. Caused by Personnel Error.Special Order 84 Revised to Require Posting of Guards | | | 05000346/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000346/LER-1979-005-03, /03L-0 on 790106:during Surveillance Testing, Borated Water Storage Tank Level Bistable Was Tripped;Valves DH9A Opened & DH7A Closed.Caused by Component Failure of Output Relay K51A & Instrument Drift | /03L-0 on 790106:during Surveillance Testing, Borated Water Storage Tank Level Bistable Was Tripped;Valves DH9A Opened & DH7A Closed.Caused by Component Failure of Output Relay K51A & Instrument Drift | | | 05000346/LER-1979-006-03, /03L-0:on 790105,reviewer Noted 781228 Record of Continuous Alarm at Contact Data Record Point F018.Panel C4705 Not Reset.Caused by Failure of Indicator Lights on Panel C4705.Panel Reset,Clearing F018.Surveillance Modified | /03L-0:on 790105,reviewer Noted 781228 Record of Continuous Alarm at Contact Data Record Point F018.Panel C4705 Not Reset.Caused by Failure of Indicator Lights on Panel C4705.Panel Reset,Clearing F018.Surveillance Modified | | | 05000346/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000346/LER-1979-007-03, /03L-0 on 790110:during Performance of Surveillance Test,Channel 2 of Containment Hydrogen Analyzer Was Found Inoperable.Caused by Defective Zener Diode in Millivolt Converter | /03L-0 on 790110:during Performance of Surveillance Test,Channel 2 of Containment Hydrogen Analyzer Was Found Inoperable.Caused by Defective Zener Diode in Millivolt Converter | | | 05000346/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000346/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000346/LER-1979-008-03, /03L-0 on 790109:during Surveillance Testing, Containment Recirculation Fan 1-1 Failed to Run.Cause Attributed to Buildup of non-conductive Film on Auxiliary Controller Contacts | /03L-0 on 790109:during Surveillance Testing, Containment Recirculation Fan 1-1 Failed to Run.Cause Attributed to Buildup of non-conductive Film on Auxiliary Controller Contacts | | | 05000346/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000346/LER-1979-009-03, /03L-0:on 790112,power to Vital Bus Y2 Lost. False Integrated Control Sys Signal Resulted in Reactor & Full Steam & Feedwater Rupture Control Sys Trip.Caused by Blown 125 Volt DC Fuse to Inverter | /03L-0:on 790112,power to Vital Bus Y2 Lost. False Integrated Control Sys Signal Resulted in Reactor & Full Steam & Feedwater Rupture Control Sys Trip.Caused by Blown 125 Volt DC Fuse to Inverter | | | 05000346/LER-1979-010-03, /03L-0:on 790112,Sys 7 Data Logger Experienced Core Dump,Voiding Computer Memory Bank Which Rendered Remote Monitoring of Fire Detection Sys Inoperable & Placed Unit in Action Statement of Tech Spec 3.3.3.8.Cause Unknown | /03L-0:on 790112,Sys 7 Data Logger Experienced Core Dump,Voiding Computer Memory Bank Which Rendered Remote Monitoring of Fire Detection Sys Inoperable & Placed Unit in Action Statement of Tech Spec 3.3.3.8.Cause Unknown | | | 05000346/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000346/LER-1979-011-03, /03L-0:on 790115,reactor Coolant Pump 1-2-2 Started W/Incorrect Breaker Alignment,Causing Low Voltage Relays to Trip Which de-energized Both 4.16 Kv Essential Buses C1 & D1.Caused by Personnel Error | /03L-0:on 790115,reactor Coolant Pump 1-2-2 Started W/Incorrect Breaker Alignment,Causing Low Voltage Relays to Trip Which de-energized Both 4.16 Kv Essential Buses C1 & D1.Caused by Personnel Error | | | 05000346/LER-1979-011, Forwards LER 79-011/03L-0 | Forwards LER 79-011/03L-0 | | | 05000346/LER-1979-012-03, /03L-0:on 790116,during Surveillance Testing,Heat Traced Line Temp Measurement Points Below 105 F Limit.Caused by Injection of Makeup (Flush) Water After Boron Injection at Temp Lower than 105 F.Tests Rerun Satisfactorily | /03L-0:on 790116,during Surveillance Testing,Heat Traced Line Temp Measurement Points Below 105 F Limit.Caused by Injection of Makeup (Flush) Water After Boron Injection at Temp Lower than 105 F.Tests Rerun Satisfactorily | | | 05000346/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000346/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000346/LER-1979-013-03, /03L-0:on 790116,when Makeup Pump 1 Started for Surveillance testing,1/2 Inch Nipple at Discharge of Attached Gear Driven Lube Oil Pump Failed,Resulting in Oil Spray Which Required Pump Shutdown | /03L-0:on 790116,when Makeup Pump 1 Started for Surveillance testing,1/2 Inch Nipple at Discharge of Attached Gear Driven Lube Oil Pump Failed,Resulting in Oil Spray Which Required Pump Shutdown | | | 05000346/LER-1979-014-03, /03L-0:on 790116,during Shutdown,Boric Acid Addition Tanks (Baat) Total Vol 3-1/3% Below Tech Spec 3.1.2.9 Requirements.Caused by Reduced Baat Vol After Completion of Required Testing Followed by RCS Boration | /03L-0:on 790116,during Shutdown,Boric Acid Addition Tanks (Baat) Total Vol 3-1/3% Below Tech Spec 3.1.2.9 Requirements.Caused by Reduced Baat Vol After Completion of Required Testing Followed by RCS Boration | | | 05000346/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000346/LER-1979-015-03, /03L-0:on 790117,core Flood Tank 1-2 Isolation Valve CF1A Would Not Close by Remote Operation.Caused by Loose Set Screw.Cracked Pinion Gear & Associated Key Replaced Per Maint Work Order 78-2928 | /03L-0:on 790117,core Flood Tank 1-2 Isolation Valve CF1A Would Not Close by Remote Operation.Caused by Loose Set Screw.Cracked Pinion Gear & Associated Key Replaced Per Maint Work Order 78-2928 | | | 05000346/LER-1979-015, Forwards LER 79-015/03L-0 | Forwards LER 79-015/03L-0 | | | 05000346/LER-1979-016-03, /03L-0:on 790124,emergency Lock Failed Leak Rate Test While Unit in Mode 5.Caused by Loosening of Shaft Seal (Teflon Packing) Due to Routine Use of Escape Lock.Packing Will Be Replaced During Next Convenient Outage | /03L-0:on 790124,emergency Lock Failed Leak Rate Test While Unit in Mode 5.Caused by Loosening of Shaft Seal (Teflon Packing) Due to Routine Use of Escape Lock.Packing Will Be Replaced During Next Convenient Outage | | | 05000346/LER-1979-016, Forwards LER 79-016/03L-0 | Forwards LER 79-016/03L-0 | | | 05000346/LER-1979-017-03, /03L-0:on 790130,photoelectric Smoke Detector Ds 8605-E in Emergency Diesel Generator 1-1 Area Not Functional.Caused by Failure of Detector.New Detector Ordered & Fire Watch Patrol Established in Area | /03L-0:on 790130,photoelectric Smoke Detector Ds 8605-E in Emergency Diesel Generator 1-1 Area Not Functional.Caused by Failure of Detector.New Detector Ordered & Fire Watch Patrol Established in Area | | | 05000346/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000346/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000346/LER-1979-018-03, /03L-0:on 790130,valves SP17A2 & SP17B2 Lifted Below Setpoint Range & Declared Inoperable.Caused by Loose Spindle on Main Steam Line Code Safety Valve SP17A2.Valve SP17A2 Gagged & SP17B2 Tested Satisfactorily | /03L-0:on 790130,valves SP17A2 & SP17B2 Lifted Below Setpoint Range & Declared Inoperable.Caused by Loose Spindle on Main Steam Line Code Safety Valve SP17A2.Valve SP17A2 Gagged & SP17B2 Tested Satisfactorily | | | 05000346/LER-1979-019-03, /03L-0 on 790129:suction & Discharge Valves on Containment Spray Pump Were Closed.Caused by Personnel Error | /03L-0 on 790129:suction & Discharge Valves on Containment Spray Pump Were Closed.Caused by Personnel Error | | | 05000346/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000346/LER-1979-020-03, /03L-0 on 790205:10 of 18 Main Steam Safety Valves Found Outside Setpoint Range.Believed Caused by Changing Ambient Conditions at Valve Locations.Valves Adjusted & Retested Satisfactorily | /03L-0 on 790205:10 of 18 Main Steam Safety Valves Found Outside Setpoint Range.Believed Caused by Changing Ambient Conditions at Valve Locations.Valves Adjusted & Retested Satisfactorily | | | 05000346/LER-1979-020, Forwards LER 79-020/03L-0 | Forwards LER 79-020/03L-0 | | | 05000346/LER-1979-021-03, /03L-0 on 790205:containment High Pressure Alarms Were Received & Safety Features Actuation Sys Channel 2 Erroneously Tripped.Cause Unknown.No Deficiencies Found from Surveillance Tests.Channel Returned to Operation | /03L-0 on 790205:containment High Pressure Alarms Were Received & Safety Features Actuation Sys Channel 2 Erroneously Tripped.Cause Unknown.No Deficiencies Found from Surveillance Tests.Channel Returned to Operation | | | 05000346/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000346/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000346/LER-1979-022-03, /03L-0 on 790208:diesel Fire Pump Battery Electrolyte Level in Four Cells Was Below Top of Cell Plates.Caused by Procedural Error.Levels Restored,Pump Declared Operable & Unit Removed from Action Statement | /03L-0 on 790208:diesel Fire Pump Battery Electrolyte Level in Four Cells Was Below Top of Cell Plates.Caused by Procedural Error.Levels Restored,Pump Declared Operable & Unit Removed from Action Statement | | | 05000346/LER-1979-023, Forwards LER 79-023/01T-0 | Forwards LER 79-023/01T-0 | | | 05000346/LER-1979-023-01, /01T-0 on 790228:Startup Transformer 01 Taken Out of Svc;Surveillance Tests Not Performed within One Hour, Contrary to Tech Spec Requirements.Caused by Personnel Error.Testing Completed as Soon as Error Realized | /01T-0 on 790228:Startup Transformer 01 Taken Out of Svc;Surveillance Tests Not Performed within One Hour, Contrary to Tech Spec Requirements.Caused by Personnel Error.Testing Completed as Soon as Error Realized | | | 05000346/LER-1979-024, Forwards LER 79-024/03L-0 | Forwards LER 79-024/03L-0 | | | 05000346/LER-1979-024-03, /03L-0 on 790214:fire Alarm Panel C4706 Signaled, Indicating Laundry Room Detector DS8630 as Source.Detector Declared Inoperable as No Cause for Signal Found.Cause of Event Undetermined.Possibly Due to Gases or Dust | /03L-0 on 790214:fire Alarm Panel C4706 Signaled, Indicating Laundry Room Detector DS8630 as Source.Detector Declared Inoperable as No Cause for Signal Found.Cause of Event Undetermined.Possibly Due to Gases or Dust | | | 05000346/LER-1979-025-03, /03L-0 on 790213:Ohio Edison Relay Testing Actuated Transfer Trip Receiving Relay & Tripped Switchyard Breakers.Caused by Failure of Util to Notify Toledo Edison Before Performing Relay Testing | /03L-0 on 790213:Ohio Edison Relay Testing Actuated Transfer Trip Receiving Relay & Tripped Switchyard Breakers.Caused by Failure of Util to Notify Toledo Edison Before Performing Relay Testing | | | 05000346/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | |
|