05000346/LER-1979-046, Forwards Revised LER 79-046/03L-1

From kanterella
(Redirected from ML19344D286)
Jump to navigation Jump to search
Forwards Revised LER 79-046/03L-1
ML19344D286
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19344D287 List:
References
L80-187, NUDOCS 8003110635
Download: ML19344D286 (1)


LER-1979-046, Forwards Revised LER 79-046/03L-1
Event date:
Report date:
3461979046R00 - NRC Website

text

.

.C TOLEDO b EDISDN EDISON PLAZA 3&) MADISON AVENUE TOLEDO. OHIO 43652 March 6, 1980 L80-187 FILE: RR 2 (NP-33-79-49)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Enclosed are three copics of Licensee Event Report 79-046 and the supplemental information sheet which has been revised. The revisions to the report are indi-cated by a "1" in the lef t margin.

Please destroy your previous copies of this Licensee Event Report and replace with the attached revision.

Yours truly, D

~

Terry D. Murray Station Superintendent Davis-Besse h*aclear Power Station TDM/ljk Enclosure cc:

Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1:

30 copics LER 79-046 Rev. 1 Mr. Norman Italler, - Director Office of Management Program Analysia Encl:

3 copies LER 79-046 Rev. 1 go os ne<63 5 I