ML19344B568

From kanterella
Jump to navigation Jump to search
Forwards LER 80-071/03L-0
Date released: 12/24/2019 Download: ML19344B568


LER 80-071/03L-0:on 800915,during Required HPCI & Reactor Core Injection Cooling,Suppression Pool Level Exceeded 27 Inches.Caused by Torus High Level Alarm Being Out of Calibr. Setpoint Reset & Operating Procedures Revised
ML19344B569
Person / Time
Site: Brunswick 
Issue date: 10/15/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344B569 (1)
Forwards LER 80-071/03L-0
ML19344B567
Person / Time
Site: Brunswick 
Issue date: 10/15/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344B567 (1)