QA Program Insp Rept 99900250/80-01 on 800721-25. Noncompliance Noted:Width,Frequency or Dwell Time of Oscillation Was Not Listed on Welding Procedure Spec as Required
ML19344B563
Person / Time
Issue date: 08/11/1980
From: Barnes I, Roberds H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19344B554 List:
References
REF-QA-99900250 NUDOCS 8010210463
Download: ML19344B563 (5)


Text

r-0l

- U.-S. NUCLEAR REGULATORY COMMISSION

. OFFICE OF INSPECTION AND ENFORCEMENT.

REGION IV

~

Report No. 99900250/80-01:

Company:

Benjamin F. Shaw Company Post Office Box 285

'Laurens,. South Carolina

. Inspection :

Conducted: -July 21-25, 1980 Inspectors:

2 [/ Ms

/

H. W. Roberds, Contractor Inspector

/Date Components.Section II

. Vendor Inspection' Branch Approved by:

b-F///Po I. Barnes, Chief Date ComponentsSection II

-Vendor Inspection Branch.

Summary.

Inspection on July 21-25, 1980 (Report No. 99900250/80-01)

Areas Inspected:

Implementation of 10 CFR'50, Appendix B, criteria and applicable. codes'and standards,. including actions.on previous inspection

. findings, nondestructive examination-(radiography), nondestructive examination (liquid penetrant and magnetic particle) and special processes personnel qualifications nondestructive examination. The inspection involved twenty-four (24) inspector-hours on-site by one (1) NRC inspector.

Results:

In-the four (4) areas inspected, no unresolved items were identified and no apparent deviations were identified-in three (3) areas.

The following deviation was identified in the.remainin'g one (1) area:

LDeviation: 1 Actions on Previous. Inspection Findings - The width, frequency or dwell time of'~ oscillation was not listed on the-WPS_as required (See Notice

-of Deviation).

w C

._8010210%J

2 DETAIL SECTION A.

Persons Contacted

  • J. J. McDermott, Vice President
  • L. P. Smeal, Quality Assurance Manager
  • A. Scarborough, Authorized Nuclear Inspector
  • T. Frolo, QA Welding Engineer M. Taylor, Chief Inspector P. Smith, Shop Supervisor
  • Denotes those present at the exit interview.

B.

Actions on Previous Inspection Findings 1.

(Closed) Deviation (Notice of Deviation Item A, Report No. 79-01):

Welding was not being performed within the amperage range of the applicable welding procedure specification.

The inspector verified by records examination, that training had been conducted relative to the importance of following.the requirements of the. applicable WPS. Observation of shop welding of three (3) different processes did not reveal a similar discrepancy.

2.

(Closed) Deviation (Notice of Deviation Item B, Report No. 79-01):

Travel speed.was not listed on the PQR for the FCA weld process in accordance with Section IX of the ASME Code.

The inspector verified that the PQR in question had been revised as committed and that additional training for concerned personnel was conducted on January 25, 1980.

However, as a result of a review of WPS to verify corrective action, an additional deviation from commitments was identified. See Katice of Deviation.

3.

(Closed) Deviation (Notice of Deviation, Item C, Report No. 79-01):

Welder performance qualification record did not reflect qualification of the welder for the process used for production welds.

The inspector verified that the records of qualification of the welder cited had been revised to reflect the correct welding process.

The current welder performance qualification records had been reviewed for accuracy and completeness'as committed.

A random selected review of five welder qualification records did not reveal a similar discrepancy.

3 C.

Nondestructive Examination (Radiography) 1.

Objectives The objectives of this area of the inspection were to verify that:

a.

Nondestructive examination (RT) is performed in accordance with approved procedures.

b.

Nondestructive examination procedures meet the. requirements of ASME Code and other applicable requiremente.

Work is accomplishe'd by, and the test results are interpreted l

c.

by,' appropriately qualified personnel.

2.

Method of Accomplishment The preceding objectives were accomplished by:

i a.

Review of the QA Manual,Section X, "Exauination, Test, and Inspections."

b.

Review of Standard Operating Procedure SP-RT-1, " Radiographic Testing."

Review of radiographs of four (4) production weld joints c.-

consisting of sixteen (16) radiographs.

l d.

Observation of radiography being performed on a pipe sub-assembly.

l l

3.

Findings Within this area of the inspection, no deviations from commitments j

or unresolved items'were identified.

l-j D.

Nondestructive Examination ~(Liquid Penetrant and Magnetic Particle) i 1.

' Objectives

[

l The objectives cf this area of the inspection-were to verify that:

Nondestructive examination (MT&PT) is performed in accordance a.

with-approved procedures.

b.

Nondestructive examination procedures meet the requirements of the ASME Code ~and other applicable requirements.

m w

9

['

4

. 4

. c.

' Review of Standard Operating Procedure,'SP-NT-1 " Magnetic Particle ~

Examination, Dry Continuous Method."

d.'

Observation'of' Liquid Penetrant and Magnetic Particle Examination being performed on production welds.

[

3.

Findings-Within this area'of the inspection, no deviations from commitments or-unresolved ~ items were' identified.

E.

Special-Processes Personnel Qualification (Nondestructive Examination) 1.

. 0bjectives

)

The objectives of this area of the inspection were to verify that:

' The employer, B.F. Shaw Co. has developed a written practice a.

for control and administration of NDE personnel training, t

examination, and certification in accordance with applicable j.

NRC and ASME Code requirements.

i b.

Personnel records are complete and are current.

Personnel performing nondestructive examinations are qualified c.

5 for the method used and have current eye examinations as i-defined in SNT-TC-1A.

E 2.

Method of Accomplishment i

]

The: preceding objectives were accomplished by:

1 Review of the QALManual,Section X, " Examination, Test, and 1

a.

Inspection."

4 b.

Review of Standard.0perating Procedure, SP-PQ-1, " Qualification i

- and Certification of Nondestructive Examination-Personnel."

c.

Review of five (5) personnel qualification and. certification l

record packages including results of eye examinations.

i d.

' Interviews with cognizant personnel.

3.

-Findings-

- Within this_ area of the. inspection, no deviations from commitments or uartsolvedgitems were identified.

i' 1

4 m

e 4g

=

y

-ar--*

= e --

?**-*

mwe-4--~-:

e-~

+-M e 1e -e <

P--e*

+

e

5 F.

Exit Meeting A post inspection exit meeting was held on July 24, 1980, with the management representatives denoted in paragraph A above.

The inspector summarized the scope and findings of the inspection.

Management

. acknowledged the statements of the inspector with respect to.the findings _as presented to them and affirmed their commitment to the quality assurance program.

4 l

1 1

j.

'T 4

9 A

r m

v

-c..

4

,=.r..

r-

.-a-.a

-