Benj amin F. Shaw Company Docket No. 99900250/80-01 NOTICE OF DEVIATION Based on the results of gut NRC inspection conducted on July 21-25, 1980, it appears that certain of your activities were not conducted in accordance with NRC requirements as. indicated below:
Criterion V of Appendix'B to 10 CFR 50 states:
" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished. " Deviations from these requirements are as follows:
Section IX of the QA Manual, paragraph 9.3.1.1., states in part, ".
. B. F.
Shaw Company's Welding Procedure Specification,
. shall be prepared and qualified in accordance with Section III and EK c the ASME Code.
Section IX of the ASME Code, paragraph QW200.1 states in part, "The data to be included on a WPS form are essential, supplementary essential, and nonessential variables (See QW-400)." Table QW-415 lists paragraph QW-410.7 as a nonessential variable for the GMAW process.
Para. QW-410.7 states:
"A change in the width, frequency or dwell time of oscillation."
Contrary to the above, Welding Procedure Specification (WPS) No. UE-8537 was not prepared in accordance with Section IX of the ASME Code, in that the width, frequency or dwell time of oscillation was not included in the WPS.