EO OPERATING DATA REPORT DOCKET NO.
50-366 DATE 10-1C-80 CO3tPLETED BY P. R. l nderwood TELEPHONZ 912-367-7781 OPERATING STATUS
~
- 1. Unit Name:
Hatch 2 Note 5
- 2. Reporting Period:
9-80
- 3. Licensed Thermal Power (5 twt):
2436
- 4. Nameplate Rating (Gross Athel:
817.0
- 5. Design Electrical Rating (Net StWe):
784.0
- 6. Staximum Dependable Capacity (Gross 31We): - 805.7
- 7. 31aximum Dependab!e Capacity (Net StWe):
772.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lesel To Which Restricted. If Any (Net 31We):
j
- 10. Reasons For Restrictions. If Any:
g i
This Sionth Yr. to.Date Cumulatise 4
1 Ja '
!!. Hours In Reporting Period 720 6575 94.08,
660.2 4850.1 7513.6
- 12. Number Of Hours R-3r Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 636.0 4573.3 6987.9
- 15. Umt Reserve Shutdown Hours 0.0 0.0 0.0 4
- 16. Gross Thermal Energy Generated (SIWH) 1467666 10106760 15600822
- 17. Gross Electrical Energy Generated (31WHI 480630 3347360 5183450
- 18. Net Electrical Energy Generated (StWH) 458908 3189477 4946614
- 19. Unit Service Factor 88.3 69.6 74.3
- 20. Unit Availability Factor 88.3 69:6 74.3
- 21. Unit Capacity Factor (Using 3tDC Net) 82.5 62.8 68.0
- 22. Unit Capacity FactorIUsing DER Net) 81.3 61.9 67.1
- 23. Unit Forced Ourage Rate 11.7 13.2 12.3
- 24. Shutdowns Scheduled Oser Next 6 StonthsIType. Date,and Duration of Eacht:
conmling and torus work.11-1-80.13 wks.
25.~ If Shut Down At End Of Report Period. Estimated Date of Startup:
' 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICALITY 1
INITIAL ELECTRICITY C0115tERCIA L OPER ATION i
... gof7 7 3
- 2.,
8010310 Yl4
i e
i' I
t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-366 1
Hatch 2 UNIT DATE 10-80 COMPLETED BY. P. R. Underwood TELEPHONE 912-367-7781 k2
-MONTH Q-Rn l
l DAY
- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l.
(MWe-Net)
(MWe-Net)
I 768 17 765 2-767 18 762 3
763
.l9 757 4
760 20 750 5
760 21 749 l
6 757 22 755 7
757 23 754 8
393 ~
24 760 j
9
-15 25 757 10 707 26-748 11 577 27 -
746 l*'
12 709 28 708 13 738
-2 29-14.
663 30
-7 15 759 3g 16 762-l-
INSTRUCTIONS On this format. list the aserage daily umt power level in MWe-Net for each day in the reporting month. Compute to
'.the nearest whole megawatt.
eu;;i L.
~
I '.. (
- .s
'~ A.
p_
50-366 DOCKET NO.
Hatch 2 UNIT SilUTDOWNS AND POWER REDUC 110NS UNIT NAME.
DATE 10-10-80 COMPLETED BY P. R. Undensood REPORT MONT11 9-80 TELEPil0NE 91P-367-7781 i
5
,$E
' g'
- Y3 Licensee Eg gn.
Cause & Corrective Action to No.
Date h
78 il 3s&
Event U
Q Prevent Recurrence 4
j ;ji E Report #
mu g
H f
+
l l
80-34 800908 F
40.3 A
3 NA CD VALV0P Rx auto scram due to MSIV not fully l
i.
open 1
80-35 800909 F
38.0 A
5 NA CD VALV0P Unit on startup ramp from above shut-
}
down, #80-34 2
3 f
80-36 800913 S
7.0 8
5 NA llE TURBIN Reduced load in order to perform l
weekly turbine test
'lj 80-37 800928 F
4.5 A
5 80-135 HC llTEXCH Reduced load due to high cot:.ductivity 80-38 800929 F
43.7 A
3 NA ilC llTEXCil Rx scramdue to low condenser vacuum 80-39 800930 F
2.3 A
5 NA ilC HTEXCil Unit on startup ramp from ab3ve shut-1 down #80-38
{
-l i
3 4
g I
2 Method:
Exhibit G - Instructions F: Forced Renon S: Scheduled A. Equi ment Failure (Explain) 1 Manual for Pseparation of Data s
B. Maintenance of Test 2-Manual Scram.
Entry Sheels for Licensee 3 Automatic Scram.
Event ReposI (LERI File (NUREG-C Refueling D-Regulatory Restriction 4 -Continuations 0161)
E Operator Training & License Examination 5-Ioad Ibcluction 5
F-Administrative 9-Other (Explain)
Exhibit 1 Same Source G-Operational Error (Emplain)
- I (9/77) 11Other (Emplain)
)
'i a
e, 4
NARRATIVE REPORT UNIT 2 Sept. 8th Rx. auto scram at 12:55 due to a MSIV being not fully open; inboard MSIV "D"
was found to have a blown slave vlinder gasket Sept. 9th Startup from.above shutdown, #80-34; Rx critical at 21:00-and generator on line at 05:13 on Sept.
10th; unit returned to 80% conditions at 19:15 on Sept. lith Sept 13th Reduced load in order to perform weekly turbine tests; unit returned to 80% conditions at 05:45 on Sept. 14th Sept. 28th Reduced load due'to high c,r. e u c t i v i t y ; conducti-vity due to a tube failure in watertrap "D"
Sept. 29th' Rx auto scram at 01:59 due to law. condenser vacuum; low vacuum due to reduction of load stated above, #80-37 Sept. 30th Startup from above shutdown, #80-38; Rx. critical at 05:40 and generator on line at 21:43; unit had not returned to 80% conditions as of 24:00 r
There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during August of 1980.
- *9 i
l E
s j
=
l
[E
- 1 h-a-A- a
- - -e
c L
I HATCH ~2 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED.FOR SEPTEMBER 1980 l
NUMBER DATE COMPLETED DESCRIPTION E730 d - 2 Fo 6~~
CRD HCU Ele t needle valve was i
out of-adjustment; adjusted valve l
and verified operation 80-3306 8-25-80 LPRM channel "B"
low
' voltage l _
power supply failed to function properly; replaced power supply g
with new I and calibrated 80-3336 8-25-80 Condensate flush valve for WSPs "B"
mix pump stroke was too long causing valve to stick closed; repaired by shortening.
valve stroke 80-3387 8-31-80 Found loose wire on starter in breaker controlling RHR/SW heat exch disch "B"
loop valve; reconnected wire 80-2538 7-23-80.
Replaced pipe between isolation valve 2Pil-F025B and mating l
(
80-3361 8-28-80 Drywell torus temp indicator recorder step advance was not working; replaced logic switch board and reset clock 80-3285 8-29-80 RWCU "A"
holding pump was leaking
' M around seal; replaced bearing and mech seal 80-3353 8-27-80 Replaced internal parts of reactor vessel level recorder because of sticking; recalibrated' l
recorder after repairing it l
80-3391
.8-29-80 HPCI booster pump and main-pump seal water-line's were leaking; replaced 4 nipples on seal water lines
'80-3183 8-29-80 Replace _d - fuel filter on 2C diesel because of high d/p 80-3439 9-3-80 Replaced. post 'and gear assembly in Rx vessel temperature recorder because they were stack
-- t e
a N.
^
80-3392 8-30-80 Replaced point card alarm in decon sul conc
'Gil-D069 hi conductivity alarm because unit did not function properly 80-3427 9-3-80 Adjusted snap switches on recombiner temp-hi/ low alarm 80-3537-9-10-80 INBD MSIV 4-way air operator valve-gasket was found blown; replaced gasket and DC coil on pilot solenoid y
80-3544 9-9-80 Removed strongbacks on drywell airlock doors 80-3521 9-14-80 Replaced log outpu.
module on turb bldg "B:
equip drain sump pump; replaced logic module because pump had failed t o_
start properly 80-1873 9-10-80 Control rod notch position switch 18 failed; replaced RPIS probe 80-3588 9-12-80 CRD HCU accum pressure switch was found out of tolerance; adjusted setpoint for proper tolerance
.80-3524 9-12-80 WSPS "A"
upper and lower s u c t iern s valves were not functioning properly; replaced faulty manual override relay 80-3438 9-11-80 Replaced fuel line check valve on D/G 2C n
80-3033
.8-20-80 Checked level switch operation on 2C11-N013A and 2Cll-N013D; found their floats were crushed; later replaced by MRs 3055 and 3056 80-3136 8-12-80 Replaced logic board in TIP machine B
because bottom limit index and core bottom l imi t incore switch were not consistent 80-3523-9-9-80 Filter precoat flow indicator was not functioning properly; replaced pointer assembly and calibrated indicator
- 80-2309 9-18-80 CRD_
cooling water pressure control vave was found leaking around 'the packing; valve packing was tightened to stop leak g
.5 l f[__-
4.. w. + u
. A - w.
i - - ~
V er 80-3624
'9-17-80 Repaired 3.
inverter legs and 2
firing gates of-the security inverter 80-3610 9-18-80 RCIC inlet drain pot isolation
~
valve was found leaking around the packing; adjusted packing to stop leaking 80-3546 9-19-80 PSW A0V to-see cooler was not operating properly; cleaned sol valve to correct q -
80-2817-9-18-80 Calibrated shutdown flooding Rx H2 level' indies. tor 80-2249 9-18-80 Replaced strain 8 auge which is connected to the post accident.
monitoring system recorders i
4 B
9 4
S i.
F 4
i
'.h :
M a.x.
-