Monthly Operating Rept for Sept 1980
ML19344B527
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/10/1980
From: Underwood P
GEORGIA POWER CO.
To:
Shared Package
ML19344B526 List:
References
NUDOCS 8010210414
Download: ML19344B527 (7)


Text

- _ _ _ _ - -.

EO OPERATING DATA REPORT DOCKET NO.

50-366 DATE 10-1C-80 CO3tPLETED BY P. R. l nderwood TELEPHONZ 912-367-7781 OPERATING STATUS

~

1. Unit Name:

Hatch 2 Note 5

2. Reporting Period:

9-80

3. Licensed Thermal Power (5 twt):

2436

4. Nameplate Rating (Gross Athel:

817.0

5. Design Electrical Rating (Net StWe):

784.0

6. Staximum Dependable Capacity (Gross 31We): - 805.7
7. 31aximum Dependab!e Capacity (Net StWe):

772.7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lesel To Which Restricted. If Any (Net 31We):

j

10. Reasons For Restrictions. If Any:

g i

This Sionth Yr. to.Date Cumulatise 4

1 Ja '

!!. Hours In Reporting Period 720 6575 94.08,

660.2 4850.1 7513.6

12. Number Of Hours R-3r Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On.Line 636.0 4573.3 6987.9
15. Umt Reserve Shutdown Hours 0.0 0.0 0.0 4
16. Gross Thermal Energy Generated (SIWH) 1467666 10106760 15600822
17. Gross Electrical Energy Generated (31WHI 480630 3347360 5183450
18. Net Electrical Energy Generated (StWH) 458908 3189477 4946614
19. Unit Service Factor 88.3 69.6 74.3
20. Unit Availability Factor 88.3 69:6 74.3
21. Unit Capacity Factor (Using 3tDC Net) 82.5 62.8 68.0
22. Unit Capacity FactorIUsing DER Net) 81.3 61.9 67.1
23. Unit Forced Ourage Rate 11.7 13.2 12.3
24. Shutdowns Scheduled Oser Next 6 StonthsIType. Date,and Duration of Eacht:

conmling and torus work.11-1-80.13 wks.

25.~ If Shut Down At End Of Report Period. Estimated Date of Startup:

' 26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICALITY 1

INITIAL ELECTRICITY C0115tERCIA L OPER ATION i

... gof7 7 3

2.,

8010310 Yl4

i e

i' I

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-366 1

Hatch 2 UNIT DATE 10-80 COMPLETED BY. P. R. Underwood TELEPHONE 912-367-7781 k2

-MONTH Q-Rn l

l DAY

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l.

(MWe-Net)

(MWe-Net)

I 768 17 765 2-767 18 762 3

763

.l9 757 4

760 20 750 5

760 21 749 l

6 757 22 755 7

757 23 754 8

393 ~

24 760 j

9

-15 25 757 10 707 26-748 11 577 27 -

746 l*'

12 709 28 708 13 738

-2 29-14.

663 30

-7 15 759 3g 16 762-l-

INSTRUCTIONS On this format. list the aserage daily umt power level in MWe-Net for each day in the reporting month. Compute to

'.the nearest whole megawatt.

eu;;i L.

~

I '.. (

.s

'~ A.

p_

50-366 DOCKET NO.

Hatch 2 UNIT SilUTDOWNS AND POWER REDUC 110NS UNIT NAME.

DATE 10-10-80 COMPLETED BY P. R. Undensood REPORT MONT11 9-80 TELEPil0NE 91P-367-7781 i

5

,$E

' g'

  • Y3 Licensee Eg gn.

Cause & Corrective Action to No.

Date h

78 il 3s&

Event U

Q Prevent Recurrence 4

j ;ji E Report #

mu g

H f

+

l l

80-34 800908 F

40.3 A

3 NA CD VALV0P Rx auto scram due to MSIV not fully l

i.

open 1

80-35 800909 F

38.0 A

5 NA CD VALV0P Unit on startup ramp from above shut-

}

down, #80-34 2

3 f

80-36 800913 S

7.0 8

5 NA llE TURBIN Reduced load in order to perform l

weekly turbine test

'lj 80-37 800928 F

4.5 A

5 80-135 HC llTEXCH Reduced load due to high cot:.ductivity 80-38 800929 F

43.7 A

3 NA ilC llTEXCil Rx scramdue to low condenser vacuum 80-39 800930 F

2.3 A

5 NA ilC HTEXCil Unit on startup ramp from ab3ve shut-1 down #80-38

{

-l i

3 4

g I

2 Method:

Exhibit G - Instructions F: Forced Renon S: Scheduled A. Equi ment Failure (Explain) 1 Manual for Pseparation of Data s

B. Maintenance of Test 2-Manual Scram.

Entry Sheels for Licensee 3 Automatic Scram.

Event ReposI (LERI File (NUREG-C Refueling D-Regulatory Restriction 4 -Continuations 0161)

E Operator Training & License Examination 5-Ioad Ibcluction 5

F-Administrative 9-Other (Explain)

Exhibit 1 Same Source G-Operational Error (Emplain)

I (9/77) 11Other (Emplain)

)

'i a

e, 4

NARRATIVE REPORT UNIT 2 Sept. 8th Rx. auto scram at 12:55 due to a MSIV being not fully open; inboard MSIV "D"

was found to have a blown slave vlinder gasket Sept. 9th Startup from.above shutdown, #80-34; Rx critical at 21:00-and generator on line at 05:13 on Sept.

10th; unit returned to 80% conditions at 19:15 on Sept. lith Sept 13th Reduced load in order to perform weekly turbine tests; unit returned to 80% conditions at 05:45 on Sept. 14th Sept. 28th Reduced load due'to high c,r. e u c t i v i t y ; conducti-vity due to a tube failure in watertrap "D"

Sept. 29th' Rx auto scram at 01:59 due to law. condenser vacuum; low vacuum due to reduction of load stated above, #80-37 Sept. 30th Startup from above shutdown, #80-38; Rx. critical at 05:40 and generator on line at 21:43; unit had not returned to 80% conditions as of 24:00 r

There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during August of 1980.

- *9 i

l E

s j

=

l

[E

1 h-a-A- a

- - -e

c L

I HATCH ~2 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED.FOR SEPTEMBER 1980 l

NUMBER DATE COMPLETED DESCRIPTION E730 d - 2 Fo 6~~

CRD HCU Ele t needle valve was i

out of-adjustment; adjusted valve l

and verified operation 80-3306 8-25-80 LPRM channel "B"

low

' voltage l _

power supply failed to function properly; replaced power supply g

with new I and calibrated 80-3336 8-25-80 Condensate flush valve for WSPs "B"

mix pump stroke was too long causing valve to stick closed; repaired by shortening.

valve stroke 80-3387 8-31-80 Found loose wire on starter in breaker controlling RHR/SW heat exch disch "B"

loop valve; reconnected wire 80-2538 7-23-80.

Replaced pipe between isolation valve 2Pil-F025B and mating l

flange for bellows

(

80-3361 8-28-80 Drywell torus temp indicator recorder step advance was not working; replaced logic switch board and reset clock 80-3285 8-29-80 RWCU "A"

holding pump was leaking

' M around seal; replaced bearing and mech seal 80-3353 8-27-80 Replaced internal parts of reactor vessel level recorder because of sticking; recalibrated' l

recorder after repairing it l

80-3391

.8-29-80 HPCI booster pump and main-pump seal water-line's were leaking; replaced 4 nipples on seal water lines

'80-3183 8-29-80 Replace _d - fuel filter on 2C diesel because of high d/p 80-3439 9-3-80 Replaced. post 'and gear assembly in Rx vessel temperature recorder because they were stack

-- t e

a N.

^

80-3392 8-30-80 Replaced point card alarm in decon sul conc

'Gil-D069 hi conductivity alarm because unit did not function properly 80-3427 9-3-80 Adjusted snap switches on recombiner temp-hi/ low alarm 80-3537-9-10-80 INBD MSIV 4-way air operator valve-gasket was found blown; replaced gasket and DC coil on pilot solenoid y

80-3544 9-9-80 Removed strongbacks on drywell airlock doors 80-3521 9-14-80 Replaced log outpu.

module on turb bldg "B:

equip drain sump pump; replaced logic module because pump had failed t o_

start properly 80-1873 9-10-80 Control rod notch position switch 18 failed; replaced RPIS probe 80-3588 9-12-80 CRD HCU accum pressure switch was found out of tolerance; adjusted setpoint for proper tolerance

.80-3524 9-12-80 WSPS "A"

upper and lower s u c t iern s valves were not functioning properly; replaced faulty manual override relay 80-3438 9-11-80 Replaced fuel line check valve on D/G 2C n

80-3033

.8-20-80 Checked level switch operation on 2C11-N013A and 2Cll-N013D; found their floats were crushed; later replaced by MRs 3055 and 3056 80-3136 8-12-80 Replaced logic board in TIP machine B

because bottom limit index and core bottom l imi t incore switch were not consistent 80-3523-9-9-80 Filter precoat flow indicator was not functioning properly; replaced pointer assembly and calibrated indicator

80-2309 9-18-80 CRD_

cooling water pressure control vave was found leaking around 'the packing; valve packing was tightened to stop leak g

.5 l f[__-

4.. w. + u

. A - w.

i - - ~

V er 80-3624

'9-17-80 Repaired 3.

inverter legs and 2

firing gates of-the security inverter 80-3610 9-18-80 RCIC inlet drain pot isolation

~

valve was found leaking around the packing; adjusted packing to stop leaking 80-3546 9-19-80 PSW A0V to-see cooler was not operating properly; cleaned sol valve to correct q -

80-2817-9-18-80 Calibrated shutdown flooding Rx H2 level' indies. tor 80-2249 9-18-80 Replaced strain 8 auge which is connected to the post accident.

monitoring system recorders i

4 B

9 4

S i.

F 4

i

'.h :

M a.x.

-