Forwards Data Rept for Inservice Insp for Pump & Valve Testing.Util Considers Inservice Insp Completed Upon Exit of Authorized Nuclear Inspector.Exit Interview for Pump & Valve Testing Program Conducted on 800430
ML19344B291
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/18/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8008260377
Download: ML19344B291 (6)


Text

e',

t e.

f iJ Mstropolitan Ednan Company h (,' {,

{'f (') f Post Of fice Box 480 d'

,Middletown, Pennsylvania 17057 717 944-4041 j

Write /s Direct Dial Nunter August 18, 1980 TLL 368

~ -.

Office of Inspection and Enforcement Attn:

B. 'H. Crier, Director Region I U. S. Nuclear Regulatory Commission King of Prussia, Pa..

19406

Dear Sir:

'Three Mile Island Nuclear Station, Unit I (THI-1)

Operating License No. DPR-50 Docket No. 50-289 Inservice Inspection Owner's Data Report The en,losed' Owner's Data Report for Inservice Inspection Form NIS-1, submitted for your information only, is in accordance with Sub-Article IWA-6,220 o'f ASME Section XI with the exception of the authorized inspector's signature. This form will be resubmitted upon receipt of the signature. The NIS-1 Form describes the THI-I Pump and Valve Testing Program which is conducte,d continuously per the requirements of Sub-Sections IWP'and IWV of the code. For pump and valve testing reporting purposes, Met-Ed considers an inservice inspection is completed upon the exit of the Authorized Nuclear Inspector. The' exit interview with the Authorized Nuclear Inspector for the Pump and Val've Testing Program was conducted on 4/30/80.

The period of' testing that this report describes starts from the end of the previous examination on 3/9/79 to 1/30/80. On 1/30/80, Met-Ed submitted a new revised valve testing program to the NRC. The enclosed report does not describe this new program.

In accordance with Sub-Article IWA-6220 of ASME Section XI, a later NIS-1 Form will address the new revised valve testing..

program. Also, he enclosed report does not address Class 1, 2 and 3 pressure boundary examinations. The NIS-1 Form for these examinatioris will be submitted 90 days after completion of the examination.

Sincerely, signed.l. G. Herbeln J. G. Herbein Vice President

\\

TMI-I 0

gh JGH:DGM: hah

\\

Enclosure q

60 8006 Metropohtan Edson Company is a Member of the General Pub!:c Unnes System

~

TMI-I BCC LIST Mrs. Pat Higgins Mr. S. H. Duerson Edison Electric Institute Babcock & Wilcox 1111 19th Street, NW P.O. Box 1260 Washington, D.C.

20555 Lynchburg, VA 24505 Mr. E. L. Blake, Jr.

Mr. T. F. Hartley, Jr.

Shaw, Pittman, Potts & Trowbridge Marsh & McLennan, Inc.

1800 "M" Street, NW 1221 Avenue of the Americas Washington, D.C.

20555 New York, NY 10020 Mr. R. Sancore Ms. Margaret Reilly American Nuclear Insurers Chief Div. of Reactor Review The Exchange - Suite 245 PA Department of Environmental Resources 270 Farmington Avenue Fulton Bank Building

- Farmington, CT 06032 Harrisburg, PA 17120 B. A. Hockley - Discovery Room Crawford Statio:

S. d Chaplin - TMI Licensing R. J. Toole - TMI-I Supervisor G. J. Troffer - TMI Trir. 198 R. F. Wilson - TMI Tr1r. 105 G. K. Hovey - TMI Trir. 105 W. N. Moreau - Met-Ed Reading P. Clark - GPUSC Parsippany C. W. Smyth - Parsippany Licensing R. Fenti - TMI - QA Trir. 22 E. G. Wallace - Parsippeay Licensing M. J. Ross - TMI - Ops. #1 W. E. Potts - TMI - Radiation Control - 1 L. W. Harding - TMI Licensing A. Bell l-TMI GORB Secretary - Parsip.

M. Nelson - Trl. 60 N. Kazanas - Parsippany - QA M. A. Shatto - TMI-I PORC Secretary - Eng. #1 J. F. Wilson - TM1 Trir. 14 G. A. Kunder - TMI-II PORC Chairman - Trl. 10 J. J. Colitz - TMI-I W. F. Schmauss - TMI-I GRC Chairman - Parsip.

B. Ballard - TMI Trir. 16 J. Thiesing - Bechtel Room #201 Admin Bldg.

G. P. Miller - TMI-I P. S. Walsh - GPU Parsippany R. C. Arnold - TMI - Trir. 201 D. Smith - Reading - Production Supervision D. G. Mitchell - Met-Ed Reading J. T. Collins - NRC Trir. #1 L k n, c.8-Tro. ; n /it p. Ma n a 9-t r-R. A. Lengel - Engineers #1 File: 02.0016.0001.0001.02

8. b A5 ks 5 -/ A l

40

~

B. H. Crier 2-TLL 368 cc:

J. T. Collins B. J. Snyder D. Dilanni R. W. Reid H. Silver D. B. Egglestor.

Hartford Steam Boiler Inspection & Insurance Co.

P.O. Box 504 Wayne, PA 19087 Mr. J. Claar, Chief Boiler Division Pa. Department of Labor &

Industry Harrisburg, Pa.

17120 s

e e

s 3

e r

-r

-- ~ -

--e..

y

-.,,-.7wc,,

,y-~-e

,, w y-

FORM NIS-1 HETROPOLITAN EDISON DATA REPORT FOR INSERVICE INSPECTIONS PUMP AND VALVE TESTING 1.

Owner Metropolitan Edison Company Reading, Pa.

(Name and Address of Owner) 2, Plant Three M'ile Island Nuclear Generating Station, Middletown. Pa.

/

(Name and Address of Plant) 3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) NA S.

Commercial Service Date 9/2/74-6.

Special Number for Unit 4177 '

7.

Components Inspected Manufacturer Compnent or Manufacturer or Installer State No._

National

)

Appurtenance or Installer Serial No.

Board No.

Various pumps N/A N/A N/A N/A and valves as described in Met-Ed's pro-gram submittal to the NRC (GQL0781 dated August 17, 1977).

8.

Examination Dates 3/9/79 to 1/31/80 9.

Inspection Interval from 9/2/74-to 9/2/84.

10. Abstract of Examinations.

The TMI-1 Pump and Valve Testing Program is conducted in accordance with Met-Ed's submittal to the NRC (GQL 0781 dated August 17,1977). This program was tranted interim approval by.the NRC on December 20, 1977.

In accordance with 10CFR 50.55a, the submittal is based upon ASHE Section XI. The object of the Pump and Valve Testing Program is to assure the operational readiness of these selected pump and valves.

11.

Abstract of Conditions Notes. Attachment A describes the conditions noted and corrective measures taken. All the components listed on Attachment A are class 3.

There were no class 1 or 2 components that required correc-tive measures during this report period.

12. Abstract of Corrective Measures Recommended and Taken. (See Attachment A)

Page 1 of 2

R.

FORM NIS-1 METROPOLITAN EDISON DATA R' PORT FOR INSERVICE INSPECTIONS E

We certify that the statement made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

.Date August 18 19 80 Signed Metropolitan Ediscn Company er By Signed J. G. Herbein Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A I, the undersigned, holding a valid comission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of and employed by of have inspected the components described in this Owner's Data Report during the period to and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector nor his imployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date 19 Commissions Inspector's Signature National Board, State, Province & No.

Page 2 of 2

o ATTACHl1ENT A TO NIS-1 FORM Conditions Noted Corrective lieasures Recocinended and Taken The test frequency was increased to monthly. 71,

1.

On 6-12-79 a Reactor Buf1 ding valve was repaired and on 7-12-79 RR-V108 was Emergency Cooling River Water Pump tested satisfactory.

RR-V102 was not required Recirculation Valve (RR-V108) did to be operable during this cold shutdown not meet its percent increase in condition.

stroke time acceptance criteria.

2.

On 4-17-79 Screen Wash Pump 1A The pump was declared inoperable. The pump was (SW-PIA) vibration fell in the overhauled and on 6-3-79, the pump was tested r,equired action range.

satisfactory. The pump was not required by Technical Specifications to be operable during this time period.

3.

On 12-12-79, SW-P1A's vibration SW-PIA testing frequency doubled. Pump was fell within the alert range.

overhauled and was tested satisfactory on 6-2-80 The pump was not required by Technical Specifi-cations to be operable during this time period.

Page 1 of 1 l