Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required
ML19344B273
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/24/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 8008260119
Download: ML19344B273 (1)


Text

I outcoq'o, UNITED STATES E

NUCLEAR REGULATORY COMMISSION o

E REGION 11

-6 o,,

A, g

101 MARIETTA ST., N.W., SUITE 3100 b

ATLANTA. GEORGI A 30303 o

In Reply Refer To:

JUL 2 41980 South Carolina Electric and Gas Company ATTN:

T. C. Nichols, Jr., Vice President Power Production and Systems Operations P. O. Box 764 Columbia, SC 29218 Gentlemen:

The enclosed IE Bulletin No. 80-18, is forwarded for your information.

Although no written response is required at this t* se, these concerns will be addressed as part of the licensing process for var plant. If you desire addi-tional information regarding this matter, plea: - contact this office.

Sincerely, W 3y?

n-

'mf James P. O'Reilly Director

Enclosures:

1.

IE Bulletin No. 80-18 w/encls 2.

List of Bulletins Recently Issued cc w/ encl:

A. A. Smith, Site QA Coordinator T. B. Conners, Jr.

O. S. Bradham, Manager Nuclear Operations 8008260 //f

SSINS No.: 6820 Accession No.:

UNITED STATES 8005050062 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EhTORCEMENT WASHINGTON, D.C. 20555 July 24, 1980 IE Bulletin No. 80-18 MAINTENANCE OF ADEQUATE MINIMUM FLOW THRU CENTRIFUGAL CHARGING PUMPS FOLLOWING SECONDARY SIDE HIGH ENERGY LINE RUPTURE Description of Circumstances:

Letters similar to the May 8, 1980 notification made pursuant to Title 10 CFR Part 21 (enclosure) were sent from Westinghouse to a number of operating plants and plants under construction (list, within enclosure) in early May, 1980.

The letters and the enclosed "Part 21" letter contain a complete description of the potential problem summarized below. The letters indicated that under certain conditions the centrifugal charging pumps (CCPs) could be damaged due to lack of minimum flow before presently applicable safety injection (SI) termination criteria are met. The particular circumstances that could result in damage vary somewhat from plant to plant, but involve unavail-ability of the pressurizer power operated relief valves (PORVs), with operation of one or more CCPs repressurizing the reactor during SI following a secondary system high endrgy line break. Since the SI signal automatically isolates the CCP mini-ficw return line, the flow through the CCPs is determined by the individual pump characteristic head vs. flow curve, the pressurizer safety valve setpoint, and the flow resistances and pressure losses in the piping and in the reactor core. That minimum flow may not be adequate to insure pump cooling, and resulting pump damage could violate design criteria before current SI termination criteria are met.

Westinghouse recommends that plant specific calculations outlined in the letter (enclosure) be performed to determine if adequate minimum flow is assured under all conditions. If adequate minimum flow is not assured, Westinghouse recommends specific equipment and pror.edure modifications which will result in adequate minimum flow. The recommended modifications assure availability of the necessary minimum flow by assuring that the mini-flow by:iss line will be open when needed, but will be closed at lower pressures when the extra flow resulting from bypass line closure might be necessary for core cooling.

DUPLICATE DOCUMENT