ML19344B203

From kanterella
Jump to navigation Jump to search
Submits Acceptance Review of FES-CP & Vols I & II of Environ Rept.Review Will Not Start Until Environ Rept & Other Documents Received
ML19344B203
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 08/21/1980
From: Carson J
ARGONNE NATIONAL LABORATORY
To: Muller D
Office of Nuclear Reactor Regulation
References
NUDOCS 8008250739
Download: ML19344B203 (1)


Text

USDymwvd EQ ARGONNE NATIONAL LABORATORY 9700 SouTk CAss At EN.E. Aarayes,ild 60439 Tdeploc312/972 3196 August 21, 1980 Mr. Daniel R. Muller Assistant Director for Environmental Technology Division of Engineering U.S. Nuclear Regulatory Comission Washington, DC 20555

Dear Mr. Muller:

The Argonne Team for the Callaway ER-OL acceptance review and PDES preparation includes:

ANL Project Leader: James E. Carson Ecology (Aquatic and Terrestrial): Rosemarie L. Devine Ecology Backup: Richard F. Freeman Cultural Resources: Sue Ann Curtis Need-for-Power Alternatives : Lee S. Busch Socio-Economics :

D. A. Brodnick Cooling System Impacts: James E. Carson Water Quality: John Milsted Thermal Discharges: Gary J. Marmer Copies of Personal Qualifications Sumary will be sent soon.

ANL possesses two documents for Callaway: one copy of the FES-CP and Vols. I and II of the ER-CP. Our copy of the ER contains some ammendments, but I'm not sure it is complete.

The ANL review cannot get off the ground until adequate nutters of the ER-OL and other documents are at the Laboratory.

Sincerely, ames E. Carson, Meteorologist ivision of Environmental Inpact Studies JEC:de cc:

A. Dvorak W. White W. Hallett T. Winters G. Manner R. Zusstran h

Y% 0

..