Notifies That Health Physics Network Telephone Sys Has Been Installed,Linking Site Health Physics Personnel W/Nrc & Regional Ofcs.Network,Activated in Emergency,Is Restricted & Should Be Used Only When Other Communications Out of Svc
ML19344B198
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/24/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8008250733
Download: ML19344B198 (2)


Text

9.

y.-

[g g ggg UNITED STATES jo NUCLEAR REGULATORY COMMisslON y

o R EGION I g

j 63t PARK AVENUE i

d f

KING OF PRUS$1 A, PENNSYl.,V ANIA 19406 APR 24 bou Docket Nos. 50-245 50-336 Northeast Nuclear Energy Company ATTN: Mr. W. G. Counsil l

Vice President - Nuclear l

Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

A new telephone system has been installed at your site called the Health Physics Network (HPN). It is part'of a system that includes all nuclear power plants, the NRC Operations Center, and the NRC Regional Offices. It is intended for use during emergencies and will function as the dedicated line between your health physics personnel and health physics personnel at the NRC Operations Center in Bethesda, Maryland and the NRC Regional Office.

In the event of a site emergency, the NRC will activate the HPN. You are still expected to use the Emergency Notification System (ENS) hotline for reporting emergencies. Connercial lines should be used if the ENS does not work. The HPN is a restricted network and should not be used by nongovernment employees at any time unless used by you to report a significant event when both the ENS and coninercial telephone lines are out of service.

Lengthy consideration was given to the most efficient number and location of extensions for the ENS and HPN at each site. It was determined that, at the typical site, the ENS should have extensions in the control room, shift supervisor's office, near site emergency operations facility (EOF) and alternate EOF, resident l

inspector's office, and the.on-site technicai support center.

Similarly, the HPN should have extensions where the HP and environmental staff would gather.

This is generally in the HP office, EOF and alternate EOF, and the resident inspector's office. Your individual locations may vary in accordance w'th your specific emergency plans.

Although each site has unique needs, a proliferation of extensions on the system could work to the disadvantage of the system. Requests for additional extensions will be closely examined and in some cases, new extensions may have to be installed at the expense of another existing extension.

8008250 7D

n Northeast Nuclear Energy Company 2

Requests for additional extensions should be directed to Thomas Melville of NRC's Teleconsnunications Branch at 301-492-8000. If you have questions on these matters, please contact Dr. Charles Gallina of this office at 215-337-5350.

Sincerely, m ~ N(<

$0-v <_-

['BhceH.Grier Director cc:

J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Hintnelwright, Licensing Safeguards Engineer l

?