Text
,
'Y %
,4
.
I g# "I
UNITED STATES
NUCLEAR REGULATORY COMMisslON
jy* k
. " j
REGION I
et
w
g
531 PARK AVENUE
KING OF PRJS$1 A, PENNSYLVANI A 19406
,
JUL 01120
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-423/80-04
This refers to the routine inspection conducted by fir. R. Feil of this office on
June 4 and 5,1980, at Millstone Nuclear Power Station, Unit 3, Waterford,
Connecticut, of activities authorized by NRC License No. CPPR-113 and to the
discussions of our findings held by Mr. Feil with Mr. D. G. Diedrick and other
'
members of your staff at the conclusion of the inspection, and to a subsequent
telephone discussion between Mr. Feil and Mr. Diedrick on June 12, 1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with ' personnel, and observations by the
inspector.
.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room.
If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this
office to withhold such information from public disclosure. Any such application
must be accompanied by an affidavit executed by the Juner of the information,
which identifies the document or part sought to be withheld, and which contains
a statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document P.com.
.
8008250
.
._ .
.
-.
.
._
.
.- . .
s.
A
Northeast NuclGar Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
&
=
obert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection Report Number
50-423/80-04
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himelwright, Licensing Safeguards Engineer
D. G. Diedrick, fianager of Quality Assurance
i
!
l
. -
- .- . - -- - - -
. .
--
.
.--
-
-.
-