ML19344A957

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/80-04 on 800604 & 05.No Noncompliance Noted
ML19344A957
Person / Time
Site: Millstone 
Issue date: 07/01/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19344A958 List:
References
NUDOCS 8008250203
Download: ML19344A957 (2)


See also: IR 05000423/1980004

Text

,

'Y %

,4

.

I g# "I

UNITED STATES

NUCLEAR REGULATORY COMMisslON

jy* k

. " j

REGION I

et

w

g

531 PARK AVENUE

KING OF PRJS$1 A, PENNSYLVANI A 19406

,

JUL 01120

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/80-04

This refers to the routine inspection conducted by fir. R. Feil of this office on

June 4 and 5,1980, at Millstone Nuclear Power Station, Unit 3, Waterford,

Connecticut, of activities authorized by NRC License No. CPPR-113 and to the

discussions of our findings held by Mr. Feil with Mr. D. G. Diedrick and other

'

members of your staff at the conclusion of the inspection, and to a subsequent

telephone discussion between Mr. Feil and Mr. Diedrick on June 12, 1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with ' personnel, and observations by the

inspector.

.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such application

must be accompanied by an affidavit executed by the Juner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document P.com.

.

8008250

.

._ .

.

-.

.

._

.

.- . .

s.

A

Northeast NuclGar Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

&

=

obert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection Report Number

50-423/80-04

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himelwright, Licensing Safeguards Engineer

D. G. Diedrick, fianager of Quality Assurance

i

!

l

. -

- .- . - -- - - -

. .

--

.

.--

-

-.

-