ML19344A526
| ML19344A526 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/31/1980 |
| From: | Jackie Cook Consumer Power Co |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19344A527 | List: |
| References | |
| 9256, NUDOCS 8008210069 | |
| Download: ML19344A526 (1) | |
Text
_
@ Consumem Power James w cook h
Vice14esident, AtidlandI4aject General of fices: 1945 West Parnali Road, Jackson, Michigan 49201 * (S17) 788-0640 July 31, 1980 Director of Nuclear Reactor Regulation Attn Mr Domenic Vassallo, Acting Director Division of Project Management 1
US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT -
DOCKET NO 50-329, 50-330 AMENDMENT 79 FILE Oh85.11 UFI 71*01*11 SERIAL 9256 1
Enclosed herewith is Amendment 79 to the Company's application for construction permits and operating licenses, containing three (3) signed originals and sixty (60) copies of Revision 29 to the Final Safety Analysis Report.
Revision 29 of the FSAR contains updated FSAR material as detailed in the application page.
In addition, there is enclosed revised material to the following supplemental information furnished pursuant to Regulatory Guide 1.70, Revision 2:
1.
Supplemental Reference Drawings (Piping and Instrument Diagrams) - Five (5) copies 2.
Supplemental Reference Drawings (Electrical and Instrumentation Control Drawings) - Three (3) copies Proof of service upon the parties listed in the revised Service List attached to Mr S A Varga's "ovember 30. 1977 letter as modified by Mr S A Varga's letter of April 24, 1978 is being provided under separate cover.
&4&ffh'?
i JWC/re THIS DOCUMEliT CONTAINS P00t]qyAUIYPAGES hd8 '310 ti
.-