ML19344A447

From kanterella
Jump to navigation Jump to search
Forwards LER 80-024/03L-0
Date released: 12/24/2019 Download: ML19344A447


LER 80-024/03L-0:on 800718,during Normal Operation,Control Room Personnel Reported UPS-1B Trouble & Loss of Voltage to MC-89B.Caused by Failed Logic Power Supply Board. Component Replaced & Unit Operationally Tested
ML19344A448
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/15/1980
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19344A448 (1)
Forwards LER 80-024/03L-0
ML19344A446
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/15/1980
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19344A446 (1)