ML19344A410

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-049/03L-1
Date released: 12/24/2019 Download: ML19344A410


Updated LER 80-049/03L-1:on 800718,during High Drywall Pressure Channel Calibr & Functional Test,Pressure Switch Actuation Found Out of Tolerance.Caused by Instrument Drift. Switch Recalibr & PT 1.1.3PC Completed Satisfactorily
ML19344A423
Person / Time
Site: Brunswick 
Issue date: 08/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344A423 (1)
Forwards Updated LER 80-049/03L-1
ML19344A409
Person / Time
Site: Brunswick 
Issue date: 08/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344A409 (1)