ML19344A258
| ML19344A258 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 02/11/1970 |
| From: | Henderson J US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19344A259 | List: |
| References | |
| NUDOCS 8008070638 | |
| Download: ML19344A258 (1) | |
Text
D"*D
- D oo o
.t
_a p
3
. (m:
b)-
]
UNITED STATES
'-F ATOMIC ENERGY COMMISSION
( ',,' },* ' I '
WASHINGTON J.C. 20545 s.
_s
/-
. sits t FEt3 1 1 1970 J. P. O'Reilly, Chief, Eeactor Inspection and Enforcement Branch Division of Compliance-CO:ISITEE3 T
.' 4NY (hTEU.ND PURI UNIT 31 AND 2)
~
DOCKET No.J0-32
@ 50-330 The enclosed report of a management meeting with the applicant, con-ducteci preparatory to the special quality assurance inspection, is forwarded for inforcation.
Subsequent to the meeting,' agreement was reached between Compliance 3
and the applicant that the inspectica vuld be ecnducted on l' arch 10, 11, 12, 19'(0.- We plan to inspect the applicant and his relationship to his principal contractors. Bechtel, San Francisco, the A/E, and Ecbcock & Wilcox, the Nuclear Contractor, have veen inspected in O.
the recent past.
V Jn J. B. Henderson Senior Construction Engineer Division of Compliance
Enclosure:
CO Report Nos. 329/70-1 and330/70-1 ccv/ enclosure:
E.'G. Cace, DRS R. S. Boyd, DE (2) 8.' Levine, DE (6)
- D. J. Skovholt, DE (3)
L. Kornblith, Jr.,-CO a --
'R. W. Kirktan,' CO:I-J..G. Davis, CO:II
_ B. H. Grier, CO:III._
- j D. I. Walker, CO
- IV
- R. W. Smith, CO
- V G. Fiorelli, CO:III f
f~}
W G Central File Q) 7 8'0l08'O 90
- 3 g