r UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In.the Matter of
)
)
CONSUMERS POWER COMPANY Docket Nos. 50-329 50-330 (Midland ~ Plant, Units 1and2)
CORRECTIONS TO THE TESTIMONY OF ARNOLD H. MELTZ The following corrections should be made in the written testimony of i
Arnold H. Meltz filed in this proceeding on November 5,1976.
1.
In line 15 on page 2, after.the period, add." Alternatively, some state regulatory commissions ~, Michigan being cne, include construction work-in-progress in the rate base but, at the same
-=mem f
r-.
time, credit NFUDC to operating income for rate-setting purposes.
Such a procedure is likely to produce substantially the same end result."
2.
In-line.1S on page 2, delete "until the 'used and useful' test is satisfied." and substitute "for many years."
3.
In line 5 on~page 3, delete "will eventually.go into the rate base."
and substitute "ratepayers will be required to support."