Corrections to Ah Meltz 761105 Written Testimony
ML19344A129
Person / Time
Site: Midland
Issue date: 01/13/1977
From: Meltz A
NRC
To:
Shared Package
ML19344A128 List:
References
NUDOCS 8007310627
Download: ML19344A129 (1)


Text

_

r UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In.the Matter of

)

)

CONSUMERS POWER COMPANY Docket Nos. 50-329 50-330 (Midland ~ Plant, Units 1and2)

CORRECTIONS TO THE TESTIMONY OF ARNOLD H. MELTZ The following corrections should be made in the written testimony of i

Arnold H. Meltz filed in this proceeding on November 5,1976.

1.

In line 15 on page 2, after.the period, add." Alternatively, some state regulatory commissions ~, Michigan being cne, include construction work-in-progress in the rate base but, at the same

-=mem f

r-.

time, credit NFUDC to operating income for rate-setting purposes.

Such a procedure is likely to produce substantially the same end result."

2.

In-line.1S on page 2, delete "until the 'used and useful' test is satisfied." and substitute "for many years."

3.

In line 5 on~page 3, delete "will eventually.go into the rate base."

and substitute "ratepayers will be required to support."