ML19343D050

From kanterella
Jump to navigation Jump to search
Ack Receipt of 810119 Amend Application.Supports Const of New Dry Conversion Fluidized Bed Line.Safety Review of Proposed Installation Not Scheduled Because Addl Info Is Required.Environ Review of Proposed Installation Encl
ML19343D050
Person / Time
Site: Westinghouse
Issue date: 03/10/1981
From: Page R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sabo A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19343D051 List:
References
NUDOCS 8104090176
Download: ML19343D050 (1)


Text

h y

g y

s-4-

a s

70-l: 5!

MAR 101981 FCUP:1TTC 70-1151 o i &"U's Smi-1107 C

r Is, g 's 0,r t'th.,

J p

Z g,in : 11981 *- ~

d u.s. g sg "'

i Westinghouse Elect.He Corporation 47f ATTN: Mr. A. Sabo, Manager License Administration

~

P.O. Box 355 Pittsburgh, Pennsylvania 15230-Gentlemen:

We have reviewed your amendment application dated January 9,1981 in which you requested authorization to initall a. new dry conversion line to replace the exist-ing Dry Conversion Fluidized Bed line at your plant in Coldnbia, South Caeolina.

Our assessment of the environmental impact of youi proposed installation (c,py attached) indicates that the action would be non-substantive and insignificant.

Accordingly, pursuant to 10 CFR 51, Section Sl.5(d)(3) an environmental impact appraisal need not be prepared. Construction of the new line may therefore procee'd.

Our safety review of your proposed installation has not been scheduied because as you are aware, additional infonation is needed to complete the review. Accord-ingly, no special nuclear material may be introduced into the new line until the safety review is complete and your license amended to authorize use of the process.

Sincerely, Original Signedby:

R. G. Page, Chief Uranium Fuel Licensing Branch Attacben:t: As'noted G

4 4

  • e 810.40'00 / D 0-

.-