Advises of Planned Site Visit to Obtain first-hand Info Re Unresolved Safety Issue A-44, Station Blackout. Visit Is Tentatively Scheduled for 810324 to Coincide W/Emergency Diesel Generator Testing Schedule
ML19343C938
Person / Time
Site: Browns Ferry  
Issue date: 03/17/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
REF-GTECI-A-44, REF-GTECI-AE, TASK-A-44, TASK-OR NUDOCS 8103250673
Download: ML19343C938 (4)


Text

p rre d

UNITED STATES

8),,

NUCLEAR REGULATORY COMMISSION c

WASHINGTON, D. C. 20555

% '.V [

March 17,1981

+...

Docket Nos. 50-259 fh fg 50-260

-V'f O

[lis,mb 50-296 d2 4

v.,,

ligg Mr. Hugh G. Parris

  • IDt Manager of Power Y'f,O I 6{@

Tennessee Valley Authority

~

500A Chestnut Street, Tower II Chattanooga, Tennessee 37401

Dear Mr. Parris:

The NRC is currently conducting a program to resolve the generic safety issue known as " Station Blackout", Unresolved Safety Issue A-44.

In order to realistically and accurately analyze this safety concern it is necessary for program participants (NRC and contractor personnel) to observe certain nuclear power plant design features and operations. We have discussed this matter with your staff and we have obtained substantial Browns Ferry plant design information through the NRC's SASA and IREP programs. After reviewing this information we find that a site visit to Browns Ferry would be beneficial to obtain first hand information through observation of certain design and operational features.

We have identified in Attachment 1 the specific items we wish to observe at the Browns Ferry site.

Of particular importance is the test of an e ergency diesel generator and discussions with operations and maintenance personnel. We would appreciate having a member of the Engineering Division staff accompany us on this site visit who has knowledge of the systems design, operation, and past reliability of the items identified in Attachment 1.

We would like to schedule this site visit for March 24,1981, or at a nearby date, to coincide with your emergency diesel generator testing schedule.

In order to expedite the visit we have provided in Attachment 2 the names of the NRC personnel who would be visiting the site.

Sincerely, is /7 hlYy/A'. Ippolito, Chief fs.shh Thomas Operating Reactors Branch #2 Division of Licensing cc w/ enclosure:

See next page 9108250Y

. - o.

BROWNS FERRY SITE VISIT AGENDA

. Emergency diesel generator (EDG) test and discussion with EDG test / maintenance /

operations personnel.

Observe layout, key-components, and interfaces:

1.

EDG auxiliary equipment and support systems 2.

Switch yarc and 4180v safety buses 3.

HpCI and RCIC 4.

DC power supplies for 1-3 above e

4 e

4 BRbWNS FERRY SITE VISIT ATTENDEES t.ar e P. W. Baranowsky

". M. Kolaczkowski R. E. Battle E. J. Campbell S. J. Arendt R. J. Clark a

Mr. Hugh G. Parris CC*

H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority 400 Commerce Avenue E 11B 33 C Knoxville, Tennessee 37902

[

Mr. Ron Rogers Tennessee Valley Authority 400 Chestnut Street, Tower II Chattanooga, Tennessee 37401 Mr. H. N. Culver 249A HBD 400 Commerce Avenue Tennessee Valley Authority Knoxville, Tennessee 37902 Robert F. Sullivan U. S. Nuclear Regulatory Commission P. O. Box 1863 Decatur, Alabama 35602 Athens Public Library South and Forrest Athens, Alabama 35611 Mr. John F. Cox Tennessee Valley Authority W9-D 207C 400 Commerce Avenue Knoxville, Tennessee 37902 Mr. Herbert Abercrombie Tennessee Valley Authority P. O. Box 2000 Decatur, Alabama 35602

.