ML19343C656
| ML19343C656 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/16/1981 |
| From: | John Miller Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19343C646 | List: |
| References | |
| NUDOCS 8103240852 | |
| Download: ML19343C656 (3) | |
Text
a.
a
- 7..M 7590-01 i
LO UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-267 PUBLIC SERVICE COMPANY OF COLORAD0 FORT.ST. VRAIN GENERATING STATION NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S.. Nuclear Regalatory Conunission (the Commission) has issued Amendment No..23 to Facility Operating License No. OPR-34 issued to the Public Service Conpany of Colorado, which revised Technical Specific-ations for operation _of the Fort St. Vrain Generating Station (the facility) located in Platteville, Colorado.
The amendment is effective as of the date of its issuance.
The amendment specifies certain license conditions for the conduct of a test. program and revises the Technical Specifications to: (1) extend the minimum sample flow limits-to cover the reactor power range of 70 to 100 -
percent, (2) define the times to start depressurization, (3) extend the core
' residence time of the fuel test elements _ and -(4) specify operator action.
time limits for power-to-flow ratios as per S.L. 3.1.
This amendment is. based on. revised data and analysis which correct certain inconsistencies with the FSAR for this facility,--identified in.1977. These inconsistencies had~ resulted in a. hold in the test program at the 70 percent. level while they were resolved.
- Now that they are resolved,.- the hold in the test program is no' longer needed,-
and the Fort St. Vrain Nuclear Generating Station-may continue previously
- authorized _ testing, rise-to-powe:r ascension up' to the designed 842 MWt for the duration of the~ testing program.' ' Subsequent power operation above the 8103 24oggg
I r
2
.A 7590-01 70 percent level will be subject to a review and evaluation of the test results by Public Service Company of Colorado and the NRC.
The applications for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5 (d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the applic-ations for amendment dated November 16, 1977, January 3,1979, January 21, 1981 and January 30,1981,(2) Amendment No. 23 to License No. OPR-34 and (3') the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, (PDR),1717 H Street, N. W., Washington, D. C. and at the Local PDR in Greeley, Colorado. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D. C.
20555, Attention: Director, Division of Licensing.
r,'.
v 7590-01 Dated at Bethesda, Maryland this 16th day of March 1981.
FOR THE NUCLEAR REGULATORY COMMISSION l,'
f ' 0,. y - _bL r,
=Qf;',, c o
/
/
/ James R. Miller, Chief
/ Standardization and Special Projects Branch Division of Licensing 1
1
.