Forwards IE Insp Repts 50-366/81-01 & 50-321/81-01 on 801126-810109 & Notice of Violation
ML19343C472
Person / Time
Site: Hatch, Millstone  Southern Nuclear icon.png
Issue date: 02/09/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19343C469 List:
References
NUDOCS 8103240299
Download: ML19343C472 (2)


See also: IR 05000321/1981001

Text

t,

4

!(f MGo

fo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

g

,.

g.

2 e

REGION 11

o,

f

101 MARIETTA sT., N.W., sulTE 3100

/

ATLANTA, GEORGIA 30303

y

FEB 0 91"1

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos. 50-321/81-1 and 50-366/81-1

This refers to the routine safety inspection conducted by R. F. Rogers of this

office on November 26 through January 9,

1981, of activities authorized by NRC

Operating License No. DPR-57 and License No. NPF-5 for the Hatch facility. Our

preliminary findings were discussed with M. Manry at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed. . inspection report.

Within these areas, the inspectica consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent require-

ments are -listed in the Notice of Violation enclosed herewith as Appendix A.

-Elements to be included in your response are delineated 'in Appendix A.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part. 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

re, ort will be placed in the NRC Public Document Room. If this report centains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such infor-

mation- from public disclosure. Any such application must include the basis for

claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

t

1 with you.

Sincerely,

-

y

.

R. C.

wis, Acting Chief

Reactor Operations and Nuclear

-

Support Branch

Enclosures:

See Page 2

ie l e s e 4 o A*t*t

- _ .

-

.

h

.

Georgia Pover Company

-2-

FEB 0 9 ice'

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/81-1

and 50-366/81-1

cc w/ enc 1:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation