ML19343C447

From kanterella
Jump to navigation Jump to search
Forwards Comments on Seismic Design Criteria for Plant Site Per Aslab Order CLI-80-30
ML19343C447
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/20/1981
From: Trifunac M
SOUTHERN CALIFORNIA, UNIV. OF, LOS ANGELES, CA
To: Lessy R
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML19343C448 List:
References
CLI-80-30, NUDOCS 8103240227
Download: ML19343C447 (1)


Text

g fMD UNIVERSITY OF SOUTHERN CALIFORNI A e.o s

),4N I, Is~g; LOS ANGELES, CALIFORNIA gooc7 UNIVERSITY PARK g

o v'.

sag.,

- SCHOOL OF ENGINEERING CD DEPARTMENT Of CIVIL ENGINEERING

( M.MAgg,g,981 wt A

IssDroer f

\\/

cv

.ru March 20,1981 Mr.'R.P. Lessy Deputy Assistant Chief Hearing Counsel

~

U.S.N.R.C.

7735 01d Georgetown Road Bethezda, Maryland 20014

Dear Mr. Lessy:

I am enclosing two copies of my. comments on the seismic design criteria for the Seabrook Nuclear Power Plant site. These comments are in response to the ASLAB order CLI-80-30,12 NRC 295,298 (1980).

Sigcerely,

~l, s -D t,,

g M.D. Trifunac

-MDT:mdm Enclosures-58'1:0 3 2 4 0 4 N