.WR 13 ~587 lEMORANDUM FOR: Files THRU:
William O. Miller, Chief License Fee Management Branch ADM FROM:
C. James Holloway, Jr., Asst. Chief. License Fee Management Branch, ADM
SUBJECT:
REVISED COST FOR SEQUOYAH 1 OPERATING LICENSE REVIEW This will revise my January 30,1981 memorandum (Enclosure 1) to the files which showed the Commission's costs of processing the operating license for i
Sequoyah 1.
By memorandum dated March 4,1981 (Enclosure 2). Herbert N. Berkow.
NRR, notified LFPS that the NRR professional manpower (47,438 hours0.00507 days <br />0.122 hours <br />7.242063e-4 weeks <br />1.66659e-4 months <br />) previously reported for the review by his memorandum date1 January 22, 1981 (Enclosure 3) snould be revised downward to 39,331 staff hours. The reduction of 8,107 staff hours decreases the total actual review cost for Sequoyah 1 from $2,956,013 to
$2.639,840, a difference of $316,173 (see sununary of review costs. Enclosure 4).
Since the cost of the review still exceeds the maximum fee of $1,024,500 prescribed by regulation unich was paid for the custom review of an initial unit at a site, no additional operating license fee is required for review of Sequoyah 1.
sg g :. n u n :M m r. :<-
C. James Holloway, Jr., Asst. Chief License Fee Management Branch Office of Administration
Enclosures:
As Stated 9
DISTRIBUTION:w/ encl:
4 License fee File LFMB R/F (2)
Docket File /
4_ *,,4/,j8
[g Manpower File CJHolloway, LFMB E
/g8
/g @
KLKohler, LFMB RMDiggs, LFM8 Ch h, j i E U j',
yA
>V ll i
~'
ILFMB:dDM LFMB$ADM I
XL egr'ej~
'os "WdNiTler"
['
ll Tl
,_" c r F L o
~
T 3/[.k81 " 7 "
-/81 -
F 3/'y/81" i
f T
+
.l.
.L
. m _,.:
..gggg o mc:.a at:ca: ::n
.~~
L a.
M * *. c m s.
. 7, \\,.,
e pa aro
,og UNITED STATES
[t$,.n g
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D. C. 20555 t
s; o /
JAN 30 1;et MEMORANDUM FOR:
Files THRU:
William O. Miller, Chief, License Fee Management Branch, ADM FROM:
C. James Holloway, Jr., Assistant Chief, License Fee Management Branch, ADM
SUBJECT:
SEQUOYAH 1 OPERATING LICENSE REVIEW COSTS On February 29, 1980 the Commission issued a partial power license for Sequoyah 1.
The license was amended on September 17, 1980 to authorize
. full power operation.
In accordance with Footnote 3 of Part 170.21, we have reviewed th'e costs incurred by the various program offices 'directly involved in the processing and issuance of the Sequoyah 1 operating license. Attached is a summary of the review costs as well as the supporting documentation from the program offices.' The attachment shows that to date a total of $2,956,013 has been expended.for the review.of Sequoyah 1.
The Office of Nuclear Reactor Regulation has informed us that the: Division of Systems Integration expects that an additional 3100,000 will be spent on the ice condenser problem before Sequoyah is granted an unconditional license. Since the maximum fee
($_l,024,500) prescribed by regulation has been paid, no additional operating license fee is required for Sequoyah 1.
C. James Holloway, Jr., Assistant Chief License Fee Management Branch Office of Administration
Enclosure:
Summary.of costs to supporting.
' documentation h 0.$ h5
^8/sCt.sJ >M /
/
. m.
o
Tennessee Valley Authority Sequoyah 1 100% Power License Issued on 9/17/80 Custom Review First Unit Docket 50-327 License DPR-77 Professional Cost Of
- Program Office Man-Hours Professional Manpower Contractual Total
' Re vi ew --
Expended Manocwer/Hr.
Cost Succort Costs D
1/
NRR' 47,438
$39 51,850,082 345,112
$2,195,194 IE'
-19,445.4 36 700,034 700,034 ACRS
- 1,215.7 50 60,785 60,785 ASLSP-(No Hearing Held).
ASLAP None 2
Total:
$2,956,013/
-2/ The total cost of. 52,956,013 exceeds the maximum fee of $1,024',500 ac stated in section 1170.21, A.
- 1. of
-Part 170.
In accordance with footnote 3 of-170.21 no additional OL fee'is due from-the licensee.
Ji/ _ 'We have not included an estimated $100,000 to;be spent by the DivisionLof Systems Integration on the ice condenser problem before Sequoyah is' granted an unconditional
. full power. license. See January 22, 1981 memorandum from Berkow to Miller.
4 f
l 66
.y* n %*% ~
[f7:e 4[ j NUCLEAR REGULATORY COMMISSION UNITED STATES e
- "-. E WASHINGTON. D. C. 20555
,.D3E/y!
t
\\...-
MAR 4
!c81 Docket Nos.
50-339 50-327
., 30RANDUM FCR: '41111am O. Miller, Chief License Fee Management Branch Office of Administration FROM:
Herbert N. Berkow, Chief Management Analysis 3 ranch Planning and Program Analysis Staff
SUBJECT:
NRR COSTS FOR NCRTH ANNA 2 AND SEQUOYAH 1 OL REVIE'dS This modifies my memoranda of January 22, 1981 which provided the staff hours for the North Anna 2 and Sequoyah 1 OL reviews.
It now appears that the original data contained hours for other NRC offices in addition to NRR, plus some incorrect activity codes.
Based on new printouts received from MPA, the correct hours are as indicated belcw.
Plant Regular Hours Non Regular Hours Total Hours North Anna 2 15,144 1520 16,664 Sequoyah 1 36,810 2521 39~,331 f,hd
< 'z,, h
/
Ie,rbert N. Berkow, Chief Management Analysis Branch Planning and Program Analysis Staff, NRR p