ML19343C191

From kanterella
Jump to navigation Jump to search
Addl Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Provides Manhours Expended in Responding to Bulletin
ML19343C191
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/22/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-23, NUDOCS 8102180901
Download: ML19343C191 (1)


Text

.

s. c F. '

DUKE POWER COMPANY Powru Duit.ntwo 4cc Sourn Cucacu Srazzr, CnAutorTz, N. C. asa4a 15

.v o.maa2ca.sa.

January 22, 1981 wn.u4 4 ACr Passiorset TritP=Oht:Anga704 Srtana Pocowcwo=

373-4083 l

G C)f N Mr. James P. O'Reilly, Director

' /&

U. S. Nuclear Regulatory Commission c [4 Region II Q

e, js 101 Marietta Street, Suite 3100 g

A v\\

Atlanta, Georgia 30303

/,Eg 4/ j_ )

g,,

f)

{-

' fr>,

01 k

?

%;;y

,Q'/

Re:

RII:JPO q#

McGuire Nuclear Station _.

/7

[g[

GJ Docket Nos g 369_and_50-3)D J

Dear Mr. O'Reilly:

In our haste to provide a timely response to IE Bulletin 80-23, we inad-vertently forgot to include our estimation of the man-hours involved.

There were approximately 200 man-hours expended in the review and pre-paration of the report and approximately 2200 man-hours required to perform the needed corrective actions.

Ve truly yours,

_h au7.:

William O.IParker, J.

RWO:scs cc:

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

20555 810218091 Q

..