ML19343C165

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1113/80-15 on 800915-19.Noncompliance Noted: Measurements for U Inside Calibr Range for x-ray Fluorescent Measurement Sys Not Taken.Details Withheld (Ref 10CFR2.790)
ML19343C165
Person / Time
Site: 07001113
Issue date: 10/17/1980
From: Bates J, Kahle J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19343C156 List:
References
70-1113-80-15, NUDOCS 8102180820
Download: ML19343C165 (1)


Text

I/.'T" ";' TI_'.* 2 l 7 7.ll:73 CQi.L.5 2.?E ! :. ;, :rgg

,o uc o

UNITED STATES 7,

/ ]'}4g[.:, j

,,,g NUCLEAR REGULATORY COMMISSION L; hi C M

[

101 M ARIETT A ST.. N.W., sVITE 3100 t

REGION 11 o

'%/

ATLANTA, GEORGIA 30303 o

OCT 171980 Report No. 70-1113/80-15 Docket No. 70-1113 License No. SNM-1097 Safeguards Group III Licensee: General Electric Company Wilmington, NC 28402 Facility Name:

General Electric Inspection at: Wilmington, North Carolina Inspection conducted: September 15-19, 1980 Type of Inspection: Unannounced Material Control and Accounting Inspector:

If k/

/o/*/jz

,-hv J. W. Bat /s, Sa'feguards Chemist Date Signed Approved by:

[h k

/ c // /77 J.B.yahle',ActingSectionChief, Dats Signed Safpguards Branch

SUMMARY

Areas Inspected: An inspection was made of the WMD measurement control program and independent inspection effort.

The inspection involved 35 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection except for the following one ites:

It was determined in three instances where the licensee failed to make measure-ments for uraniwn inside the calibrated range for the x-ray fluorescence measure-ment system (deficiency 80-15-01).

S-F2 M I

Copy of Copies

/2 Tages 3 } ()o 3 g ($%

This Docurent is not to be MTERi!J. IITl5!.'.;TTED llERO.ViTH reproduced withnut specific C0!iTAlHS 2.7031:;F0ENT13N opprevai cf IE:II L