ML19343C165
| ML19343C165 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 10/17/1980 |
| From: | Bates J, Kahle J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19343C156 | List: |
| References | |
| 70-1113-80-15, NUDOCS 8102180820 | |
| Download: ML19343C165 (1) | |
Text
I/.'T" ";' TI_'.* 2 l 7 7.ll:73 CQi.L.5 2.?E ! :. ;, :rgg
,o uc o
UNITED STATES 7,
/ ]'}4g[.:, j
,,,g NUCLEAR REGULATORY COMMISSION L; hi C M
[
101 M ARIETT A ST.. N.W., sVITE 3100 t
REGION 11 o
'%/
ATLANTA, GEORGIA 30303 o
OCT 171980 Report No. 70-1113/80-15 Docket No. 70-1113 License No. SNM-1097 Safeguards Group III Licensee: General Electric Company Wilmington, NC 28402 Facility Name:
General Electric Inspection at: Wilmington, North Carolina Inspection conducted: September 15-19, 1980 Type of Inspection: Unannounced Material Control and Accounting Inspector:
If k/
/o/*/jz
,-hv J. W. Bat /s, Sa'feguards Chemist Date Signed Approved by:
[h k
/ c // /77 J.B.yahle',ActingSectionChief, Dats Signed Safpguards Branch
SUMMARY
Areas Inspected: An inspection was made of the WMD measurement control program and independent inspection effort.
The inspection involved 35 inspector-hours onsite by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection except for the following one ites:
It was determined in three instances where the licensee failed to make measure-ments for uraniwn inside the calibrated range for the x-ray fluorescence measure-ment system (deficiency 80-15-01).
S-F2 M I
Copy of Copies
/2 Tages 3 } ()o 3 g ($%
This Docurent is not to be MTERi!J. IITl5!.'.;TTED llERO.ViTH reproduced withnut specific C0!iTAlHS 2.7031:;F0ENT13N opprevai cf IE:II L