Forwards IE Insp Rept 50-395/80-30 on 801020-24.No Noncompliance Noted
ML19343C148
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/30/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19343C149 List:
References
NUDOCS 8102180744
Download: ML19343C148 (2)


See also: IR 05000395/1980030

Text

k

) / " %,.

/

'Q

UNITED STATES

(

e*

,e

ft

flUCLEAR REGULATORY COMMISSION

1. k:,9

E

REGION 11

- (M4 /

101 M ARIETT A ST.. N W.. SUITE 3100

ATLANTA. GEORGI A 30303

f

-<3

e

    • "

Or'. 3 ,1990

In Reply Refer To:

RLI-:EHG -- x

-

(d0_-395/80-30)

<

'

South Carolina Electric and Gas Company

o

Eg0

ATTN:

T. C. Nichols, Jr. , Vice President

%.

-

gj_u.,, T Q $',, b oe2 gg/ A

Power Production and Systems Operations

f

7

P. O. Box 764

p

Columbia, SC 29218

r

[#

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on

October 20-24, 1980, of activities authorized by NRC Construction Permit No.

CPPR-94 for the Summer facility, and to the discussion of our findings held with

0. S. Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

l

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspe -* ion, no items of noncompliance were disclosed.

We heve examined actions you save taken with regard to previously identified

enforcement matters and unrest ved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordanca with Section 2.790 of the NRC's " Rules of Practice", Part 2,

i

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

l

inspection report will be placed in the NRC's Public Document Room.

If this

j

repcrt contains any information that you (or your contractor) believe to be

l

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be. prepared so

that proprietary information identified in the application is contained in a

,

l

separate part of the document. If we do not hear from you in this regard within

j

the specified period, the report will be placed in the Public Document Room.

l

8102180

4

.

DE"

7:'- 0

2

South Carolina Electric and Gas Company

-2-

Should you have any questions concerning this letter, we will be glad to di,cuis

them with you.

Sincerely,

g

C. E. Murphy, Chief

D

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report No. 50-395/80-30

cc w/ encl:

A. A. Smith, Site QA Coordinator

0. S. Bradham, Manager

Nuclear Operations