Forwards Reactor Bldg Cable Separation Analysis Rept - Shoreham Nuclear Power Station, Describing Primary & Secondary Containments Design Analysis.Ongoing Analysis Will Terminate Upon Installation of Class IE Cables
ML19343C126
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 02/10/1981
From: Novarro J
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19343C127 List:
References
SNRC-532, NUDOCS 8102180685
Download: ML19343C126 (2)


Text

.-.m.

LONG ISLAND LIGHTING COMPANY 7 #4d"O 2&gaww SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY RO AD + WADING RIVER. N.Y.11792 m.,mw

,.sa SNRC-532 February 10, 1981 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Reactor Building Separation Analysis Shoreham Nuclear Power Station - Unit 1 Docket No. 50/322

Dear Mr. Denton:

By letter dated December 30, 1980 (SNRC-526), Long Island Light-ing Company submitted the Shoreham preliminary REACTOR BUILDING SEPARATION ANALYSIS REPORT, which provided the analysis results for the Reactor Building primary containment drywell area and elevation 8' of the secondary containment.

Analysis results covering the remaining levels within the secondary containmel.t were in the final stages of completion and were not available at that time.

The preliminary report was submitted in this manner in order to afford your staff the opportunity for a preview in preparation for today's meeting on the subject.

l Submitted herewith are six (6) copies of the Shoreham REACTOR l

BUILDING SEPARATION ANALYSIS REPORT, which provides a description l

of the analysis performed and includes the completed analysis results for the primary and secondary containments.

l This analysis will be an ongoing effort which will terminate l

upon completion of the installation of all Class IE cables and associated equipment.

At that time, an "as-built" review will be performed to ensure the validity of the inputs to the analysis, as well as to check the engineering and construction efforts.

1 s

8102180 GirdF FC.4935

Mr. Denton February 10, 1981 Page 2 We trust this information will resolve all NRC concerns previously identified.

Very ruly yours, J.

P. Nov rro Project t anager Shoreham Nuclear Power Station CC/pd Enclosures cc:

R. T. Carlson J. Higgins l

l l

i 2

..