ML19343C036

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1981
ML19343C036
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/12/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19343C038 List:
References
NUDOCS 8102180520
Download: ML19343C036 (1)


Text

  • Atbama Power Company 600 North 18th Street Post Offico Box 2641 Birmingham. Alabama 3$291 Telephone 205 250-1000 m

F. L CLAYTON, JR.

Senior Vice President Alabama Power the soutrem electnc system February 12, 1981 Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the January, 1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, 9d DL)Clayton,,Jr.

I i

FLCJr/JRC:bhj Attachments cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) hoo%

5 II

[

8102180 g o