i JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS January, 1981 Alabama Power Company's Joseph M. Farley Nucleal Plant, Unit 2 received its Operating License (O. L. ) on 10/23/80.

The projected date for initial core load is March 8, 1981.

i 8102180960

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 2/01/81 COMPLETED BY W. G. Hairston, II TELEPHONE NO O M o-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit.

NJtes 1) Received Operating

2. Reporting Period:

Januarv. 1981 License 10/23/80. Initial 132 core load projected for

3. Licensed Thermal Power (MWt):

860 March 8, 1981.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

829 860*

6. Maximum Dependable Capacity (Gross MWe):

829*

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To which Restricted,if Any (/ANet MWe):

N

10. Reasons For Restrictions.If Any:

This Month Yr.-to.Date Cumulative

11. Hours in Reporting Period 0

0 0

12. Number Of Hours Reactor Was Critical 0

0 0

0 0

0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Lir.e 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0

0 0

0

16. Gross Thermal Energy Generated (MWH) 0 0
17. Gross Electrical Energy Generated (MWH) 0 0

0 0

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA NA NA NA
21. Unit Capacity Factor (Using MDC Net)

NA NA NA

22. Unit Capacity Factor (Using DER Net)

NA NA NA

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and.Durntion of Each1:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status tPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 4/9/81 NA INITIAL ELECTRICITY 4/18/81

.NA 7/15/81 NA COMMERCIAL OPERATION

  • The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience.

pp7) 2

-g J-t

  1. .-S+
  • w ew
  • y 9-+-

cr-

4 AYERAGE DAILY UNITPOWER La%

e

..y 50-364 DOCXIT NO.

(%

.,s y

s.

DATE 2/1/81 COMPLETED BY W. G. Hairston, III f

TELEPHONE

("

o 5' "

MON Januarv. 1981 DAY AVERAGE DAILY POWER LEVEL,

DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(HWe-Net) g, No power output in January 37 18 2

3 19 4

20

~

21 t

6 22 4-7 23 l

8 24 s

9 25 10 26 i

11 27 12

. 28 13 3

14 30

- 31 15 16 INSTRUCEONS On this formar. list the aver:ge d:ily unit power levet in MWe-Net for exh day in the repomnt rnonth. Compute to the nearest whcie mepwatt.

~

)

.l a

.m

_4

-= = --

---e-e--

=

" "- "~'

~~'

y..,w,,.

--3y

,,--.,,w

.y m--,,,,,,-,w.-,,.,,._,.,.y,-.,,.,-..r

,,,y

5

~

\\

)

50-364 IMX'KE I NO tlNIT SilU11) OWNS AND POWER REDUCIlONS DATE 2/1/81 COMPLElEp ilY W. G. Itairston. III REPORT MON HI January, 1981 TELEPIIONE (2051899-5156 e.

E E

w 3E 3

$YE Licensee Eg f.

Cause & Cossective No.

llate g

5g s

.3 s 5 Event gy gu3 Actiim to j iy3 g Repost #

are o Pieveni Hecussente H

g d

i Recci, ed Operating Lice tse 10/2 $/80.

Initiel core load pr >j ec t ei for Marcli 8, 1981.

1 2

3 4

F: Fosced Reason:

Meilmd:

Exhibie G-lustructiims S: Stlieduled A-E luipment failuse(Explain) 1 -Manual for Prepara: ion of Data 11 Maintenance ai Test 2-Manual Sciam.

Entsy Sheets fos Iieensee C-Hefueling 3 Automatic Scram.

Esent Repos: (l ER) File INilREG-D Regulaiosy Resisiction 4 Other (Explain) 0161) li-Opesaion Training A 1.icense Exandnation F-Adminisisalive 5

G Opesational Es ros (Explain) f minhis I - Same Sousee 19/??)

II Othes (lixplaini