i JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS January, 1981 Alabama Power Company's Joseph M. Farley Nucleal Plant, Unit 2 received its Operating License (O. L. ) on 10/23/80.
The projected date for initial core load is March 8, 1981.
i 8102180960
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 2/01/81 COMPLETED BY W. G. Hairston, II TELEPHONE NO O M o-5156 OPERATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit.
NJtes 1) Received Operating
- 2. Reporting Period:
Januarv. 1981 License 10/23/80. Initial 132 core load projected for
- 3. Licensed Thermal Power (MWt):
860 March 8, 1981.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
829 860*
- 6. Maximum Dependable Capacity (Gross MWe):
829*
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To which Restricted,if Any (/ANet MWe):
N
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to.Date Cumulative
- 11. Hours in Reporting Period 0
0 0
- 12. Number Of Hours Reactor Was Critical 0
0 0
0 0
0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Lir.e 0
0 0
- 15. Unit Reserve Shutdown Hours 0
0 0
0 0
0
- 16. Gross Thermal Energy Generated (MWH) 0 0
- 17. Gross Electrical Energy Generated (MWH) 0 0
0 0
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor NA NA NA
- 20. Unit Availability Factor NA NA NA NA NA NA
- 21. Unit Capacity Factor (Using MDC Net)
NA NA NA
- 22. Unit Capacity Factor (Using DER Net)
NA NA NA
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and.Durntion of Each1:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 4/9/81 NA INITIAL ELECTRICITY 4/18/81
.NA 7/15/81 NA COMMERCIAL OPERATION
- The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience.
pp7) 2
-g J-t
- .-S+
- w ew
- y 9-+-
cr-
4 AYERAGE DAILY UNITPOWER La%
e
..y 50-364 DOCXIT NO.
(%
.,s y
s.
DATE 2/1/81 COMPLETED BY W. G. Hairston, III f
TELEPHONE
("
o 5' "
MON Januarv. 1981 DAY AVERAGE DAILY POWER LEVEL,
DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(HWe-Net) g, No power output in January 37 18 2
3 19 4
20
~
21 t
6 22 4-7 23 l
8 24 s
9 25 10 26 i
11 27 12
. 28 13 3
14 30
- 31 15 16 INSTRUCEONS On this formar. list the aver:ge d:ily unit power levet in MWe-Net for exh day in the repomnt rnonth. Compute to the nearest whcie mepwatt.
~
)
.l a
.m
_4
-= = --
---e-e--
=
" "- "~'
~~'
y..,w,,.
--3y
,,--.,,w
.y m--,,,,,,-,w.-,,.,,._,.,.y,-.,,.,-..r
,,,y
5
~
\\
)
50-364 IMX'KE I NO tlNIT SilU11) OWNS AND POWER REDUCIlONS DATE 2/1/81 COMPLElEp ilY W. G. Itairston. III REPORT MON HI January, 1981 TELEPIIONE (2051899-5156 e.
E E
w 3E 3
$YE Licensee Eg f.
Cause & Cossective No.
llate g
5g s
.3 s 5 Event gy gu3 Actiim to j iy3 g Repost #
are o Pieveni Hecussente H
g d
i Recci, ed Operating Lice tse 10/2 $/80.
Initiel core load pr >j ec t ei for Marcli 8, 1981.
1 2
3 4
F: Fosced Reason:
Meilmd:
Exhibie G-lustructiims S: Stlieduled A-E luipment failuse(Explain) 1 -Manual for Prepara: ion of Data 11 Maintenance ai Test 2-Manual Sciam.
Entsy Sheets fos Iieensee C-Hefueling 3 Automatic Scram.
Esent Repos: (l ER) File INilREG-D Regulaiosy Resisiction 4 Other (Explain) 0161) li-Opesaion Training A 1.icense Exandnation F-Adminisisalive 5
G Opesational Es ros (Explain) f minhis I - Same Sousee 19/??)
II Othes (lixplaini