ML19343B964
| ML19343B964 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/12/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19343B965 | List: |
| References | |
| NUDOCS 8102180396 | |
| Download: ML19343B964 (1) | |
Text
Atbima Power Company 600 North 18;h Street Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 m
F. L CLAYTON, JR.
Sen or Vice President Alabama Power ttw sotthern electnc gstem February 12, 1981 Docket No. 50-364 Director
'e Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the January, 1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as requirtd by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Sur:: mary of Operating Experience" is included in the attached report.
If you have any questions, please ad'.*ise.
Yours very truly,
~
3 & C 2*
rn n n F. L. Clayton/ Jr.
FLCJr/JRC:bhj Attachments cc:
Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy) 008 5
l/
81021803%
b