s.
s-e OPERATING DATA REPORT
~
DOCKET NO. En 245 DATE Rn12nd i
COstPLET ED BY R Harren l
TEl.EPl!ONE pnV4L1792 i
(
OPERATING STATUS i
N"
- 1. Unit Name:
Millstone Unit L November 1980
- 2. Reposting Period:
- 3. Licensed Thennal Power (h!Wt):
7011 669
- 4. Nameplate Rating (Gross StWe):
660
- 5. Design Electrical Rating (Net 51We):
- 6. Ataximum Depend.ible Capacity (Gross StWe):
68a 654
- 7. Sf aximum Dependab!c Capacity (Net 31We):
- 8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
N/A N/A
- 9. Power Lcsel To which Restricted,if Any (Net StWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A N/A N/A This 5!onth Yr..to.Dat e Cumulatise.
720 8040.0 ' e.
87720.0 II. Ifours in Reporting Period 0
6074.3 66459.3
- 12. Number Of liours Reactor Was Critical
- 13. Reactor Resene Shutdown flours 0
592.3 1527.3 0
6030.3 64126.2
- 14. IIours Generator On.Line 0
26.5_
26.5
- 15. Unit Resene Shutdown liours 0
10,382,182__
114,430,127
- 16.. Gross Thermal Energy Generated (51WH)
- 17. Gross Electrical Energy Generated (11WH) 0 _ _ _,,,
3,564,500 38,795,896-
- 18. Net Electrical Energy Generated (51Wil) 0 (-21101 3.392.539 37'.032.321_
0.0 75.0
.73.1
- 19. Unit Senice Factor 0.0'
- 75. 3 __
73.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using 51DC Nety -
0.0 64.5-64.6 0.0 63.4 64.0
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 0.2 _
15.4
- 24. Shutdowns Scheduled Oser Next 6 Stonths(T3 pe.Date,and Duration of Eacht:
~N/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
lanuary 12, 1981
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY N/A CostilERCI A L OPER ATION '
-8012.230 }L
("/77)
,y y
r p
v y-gr 9
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
Gn_7as UNIT Millstone-1 DATE -801204 i
COMPLETED BY C-Harran TELEPliONE 203/447-1792 Ext. 655 MONT!i f40VEMBER i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(51We-Net) 1 0
17 0
4
^
2 0
0 18 i
3 0
19 0
4 0
20 0
5 0
21
-0 i
6 0
22 0
7 0
23 0
0 0
8 24 0
9 25 0
i 10 0
0-26 11 0
.27 0-12 0
23
-0 13 0
0 29 0
14 30 0'
4 15 0
3 16 0
INSTRUCTIONS On this format, list the aserage daily unit power levelin MWe Net for each day in the reporting month. Compute to
}
the nearest whole megawatt.
(9/77) 1 1
~
s 50'-245 UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AME Mi'letnnn 1 DATE 80 204 NOVEMBER COMPLETED fly G. Ilarran REPORT MON.DI TELEPilONE 203/44/-l192 Ext. 655 n.
E c
.3 g
}
$Y3 Licensee E v,
- 9, Cause & Corrective f
No.
Date g
3g g
,g g 5 Event g'
gO3 Action to
$ 5,
'5 35c Report #
cn U Prevent Recurrence H
o g
u O
10a 801004 S
720 C
N/A 80-18/IP CC SUPORT The Unit was shutdown for Annual 80-18/lT Refuel Outage during the entire month.
80-19/IP CF PIPEXX Two LER's resulted and were related 80-19/lT to;
- 1. Main Steam support welds.
- 2. Isolation Condenser nozzle weld.
~.
1
-2 3
4 F: Forced '
Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data II. Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-
. D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
!!-Other (E xplain) o O
Docket No.
50-245
~
Page 1 of 1 Date an1?na Unit Name Millstnnn 1 Completed By G. Harran Telephone ' 203/447-1792 Ext. 655 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month SEPTEMBER DATE SYSTEM COMPONENT MAINTENANCE ACTION i
9/16/80 338 Standby Lube Oil Disassembled, cleaned heating elements, Diesel Generator Electric Ileater reassemble.
9/18/80 321 Kinney Strainer - Inlet Ins'talled a damaged control plug and band Service Water Pressure Gauge Connection over pressure gauge opening - temporary fix -
awaiting ' refuel outage (Service Water Outage) 9/22/80
'344 18B Battery Charger -
Changed potentiometer.
125V DC Electrical Erratic potentiometer System 9/23/80 309' Closed cooling Water TBCCW Heat Exchanger "B" Plugged three leaking tubes.
System j
6/25/80 345 Reactor Building overhead crane, Found a faulty potentiometer and replaced Misc.
erratic trolley movement in east it with a new one.
~
to west direction 4
~
0 f
e i
e
.~
REFUELING INFORi% TION REQUEST l.
Name of facility:
fiillstone 1 2.
Scheduled date for next refueling shutdown:
Spring 1982 3.
Scheduled date for restart foll,owing refueling: 3 9,.1999 4.
Will refueling or resumption of oceration thereafter. require a technical specification change or other license amendment?
Yes. Technical Specification changes regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical P' ear Ratio-5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Winter 1982 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new ocerating procedures:
?
168 " Retrofit" 8 x 8 fuel assemblies are scheduled for insertion in cycle 9 (reload 8).
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:
580 (b) In SFP:
944 8.
The present licensed spent fuel pool storage capacity and the size of any in-crease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
2184 assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1991, Core Full, Spent Fuel Pool contains 2120 bundles.
Gh:r.:w