ML19343B296

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/80-45 on 801027-28.No Noncompliance Noted
ML19343B296
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/14/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19343B298 List:
References
NUDOCS 8012230187
Download: ML19343B296 (2)


See also: IR 05000373/1980045

Text

,

I

p reeg'o

8

UNITED STATES

E

.,(h

.

NUCLEAR REGULATORY COMMISSION

g

"/r

REGION lli

+

'

'f

o

799 ROOSEVELT ROAD

j'

GLEN ELLYN. ILLINots 60137

+....

Ui. 1

.3

c.j

,

,

>

~

R

..

-

-

_.

-

n

c>

x.

-

f.

Docket No. 50-373

2l%

n

l$

"

$

Eia

Commonwealth Edison Company

M

iU

"fi

ATTN:

Mr. Cordell Reed

O

p

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine inspection conducted by Messrs. D. E. Miller,

L. J. Hueter, and P. C. Lovendale of this office on October 27-28, 1980,

of activities at LaSalle County Nuclear Station, Unit I authorized by NRC

Construction Permit No. CPPR-99 and to the discussion of our findings wit h

Mr. Holyoak and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies treas examined

during the inspection. Within these areas, the, inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompli :nce with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the hhC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

l

considered pre. rietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure

to the application.

8012230

,

s'

-

g" -

e-

g

,

Commonwealth Edison Company

-2-

  • * -

'

We will gladly discuss any questions you have concerning this

inspection.

-

Sincerely,

d

cW

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection

Report No. 50-373/80-45

cc w/ encl:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

Construction Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Mr. B. B. Stephenson

Project Managet

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney Cencral

_