ML19343B251
| ML19343B251 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/01/1980 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19343B250 | List: |
| References | |
| NUDOCS 8012160400 | |
| Download: ML19343B251 (4) | |
Text
._
OPERATING DATA REPORT DOCKET NO.
50-364 DATE _12/1/ 60 COMPLETED BY U.
C.
Hairston (20M 699-p156, III TELEPHONE OPERATING STATUS I. Unit Name:
Joseph M. Farley - Unit 2 Notes 1) Received operating
- 2. Reporting Period:
November. 1980 License 10/23/80.
Initial
- 3. Licensed Thermal Power (MWt):
132 c re 1 ading projected for
- 4. Nameplate Rating (Gross MWe):
860 January 10, 1981.
- 5. Design Electrical Rating (Net MWe):
829
- 6. Masamum Dependable Capacity (Gross MWe):
860*
r
- 7. Maxm um Dependable Capacity (Net MWe).
829*
L If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A o
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N /A This %eth Yg h
'g II. Hours In Reporting Period 0
0 0
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
0 0
~
- 34. Hours Generator On-Line 0
0 0
- 35. Unit Reserve Shutdown Hours 0
0 0
s
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Electrical Energy Generated (MWH) 0 0
0
- 78. Net Electrical Energy Generased (MWH) 0 0
0
- 39. Unit Service Factor
- 20. Unit Availability Factor NA NA NA NA NA NA
- 21. Unit Capacity Factor (Using 41DC Net)
NA NA NA
- 22. Unit Capacity Factor (Using D2R Net)
NA NA NA
- 23. Unit Forced Outage Rate NA NA NA
- 24. Shutdowns Scheduled Over Nex 6 Momehs (Type. Date,and Duration of Eacht:
N/A
~
~
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 2/15/81
~
NA INITIAL ELECTRICITY
_2/24/81 NA COMMERCIAL OPERATION 4/1/81 NA
- The Nameplate Rating / Design Electrical Rating will be used for.,the Maximum
- Dependable Capacity until an accurate value can be determined.from Operating experience.
N/771 f
.8012.160 00.
a
,a g,
m,
~
--,._..,e
, _. ~,.. - -. - _.. -... -,, -,, _ -.,.,.,,,. _,.. -.. ~. _,....., _. _., _... _ -., -.... _ _.
AVERAGE DAILY UNIT POWER LEVEL
,/
50-364 gg go, C
2 UNIT DATE
' '~ -
.G. Hairston, m COMPLETED BY (205)899-5156 November, 1980 4
DAY AVERACE DAILY POWER LEVEL,
DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) g No power output in November g7 2
18 3
19 4
20 5
21
6 22 7
23 8
M 9
25 10 26
' 11 27 12
. 28 13 29 i
14 30 15
- 38 I
16 l
INSTRUCITONS On this format.!ist the sverage daily unit power level in MWe-Net for each day ir. the reporting month. Compute to the nearest whole rnegswatt.
e OF)
Q, l
,r,-y-., - - -
---.-s
--+--v-,.
-y
-,e,-%
~.- - - = *
-*+--%e--w.=--.<-e------
=-
-====-r-e
- -r=-w-e'e-
-+=- = - *
-* = * ' -*-
i I
s UNIT SilulDOWNS AND POWER REDUCllONS DOCKET NO.
50-364 UNIT NAME
.1.M.
Farley - Unit'2 DATE 12/1/80 COMPLETED 8Y E.G. liairston. III REPORT MONTil November. 1980 TELEPif0NE (205)899-5156 re.
E
=
re 3 r.a 55 9$h E ICCH5CC h1 Cause & Ongrective
~c u
g3d'C i
eE a
2 5 a:
Event t; T d
Adion to g$ 5 5
jdig Repost #
iN 0 0
H Pseveni Recurrence t5 Rece. ved Operatio g Lit ense 10/ 23/80 Init tal core load
>roj ec t ed for Jai uary 10, 1981.
Y i
_.3 g 3.-
u 5$Y 3
Ok is-aS YJ.
~
W b
I 2
3 4
10 Foiced
- teason:
Method:
Exinbit G. Instructions S: Scheduled A-Equipnient Failure (Explain) l Manual for Psepasatiini of Data B-Maintenance oi Test 2-Manual Sesain.
Entry Sheets for 1.ieensee C Refueling 3 Automatic Scram.
Event Repost (EER) File INtIREG-D-Regulato y itesisiction 4-Othes (Explain) 0161)
E Operator Tsaining & 1icense I xamination F-Adnunisuative 5
G-Opesational Enos (lixplain)
E xhib I I - Same Somcc 19/77) ll Other (Explain)
- -..