Monthly Operating Rept for Nov 1980
ML19343B251
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1980
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19343B250 List:
References
NUDOCS 8012160400
Download: ML19343B251 (4)


Text

._

OPERATING DATA REPORT DOCKET NO.

50-364 DATE _12/1/ 60 COMPLETED BY U.

C.

Hairston (20M 699-p156, III TELEPHONE OPERATING STATUS I. Unit Name:

Joseph M. Farley - Unit 2 Notes 1) Received operating

2. Reporting Period:

November. 1980 License 10/23/80.

Initial

3. Licensed Thermal Power (MWt):

132 c re 1 ading projected for

4. Nameplate Rating (Gross MWe):

860 January 10, 1981.

5. Design Electrical Rating (Net MWe):

829

6. Masamum Dependable Capacity (Gross MWe):

860*

r

7. Maxm um Dependable Capacity (Net MWe).

829*

L If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A o

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N /A This %eth Yg h

'g II. Hours In Reporting Period 0

0 0

12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 0

0 0

~

34. Hours Generator On-Line 0

0 0

35. Unit Reserve Shutdown Hours 0

0 0

s

16. Gross Thermal Energy Generated (MWH) 0 0

0

17. Gross Electrical Energy Generated (MWH) 0 0

0

78. Net Electrical Energy Generased (MWH) 0 0

0

39. Unit Service Factor
20. Unit Availability Factor NA NA NA NA NA NA
21. Unit Capacity Factor (Using 41DC Net)

NA NA NA

22. Unit Capacity Factor (Using D2R Net)

NA NA NA

23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Over Nex 6 Momehs (Type. Date,and Duration of Eacht:

N/A

~

~

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 2/15/81

~

NA INITIAL ELECTRICITY

_2/24/81 NA COMMERCIAL OPERATION 4/1/81 NA

  • The Nameplate Rating / Design Electrical Rating will be used for.,the Maximum
  • Dependable Capacity until an accurate value can be determined.from Operating experience.

N/771 f

.8012.160 00.

a

,a g,

m,

~

--,._..,e

, _. ~,.. - -. - _.. -... -,, -,, _ -.,.,.,,,. _,.. -.. ~. _,....., _. _., _... _ -., -.... _ _.

AVERAGE DAILY UNIT POWER LEVEL

,/

50-364 gg go, C

2 UNIT DATE

' '~ -

.G. Hairston, m COMPLETED BY (205)899-5156 November, 1980 4

DAY AVERACE DAILY POWER LEVEL,

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) g No power output in November g7 2

18 3

19 4

20 5

21

6 22 7

23 8

M 9

25 10 26

' 11 27 12

. 28 13 29 i

14 30 15

- 38 I

16 l

INSTRUCITONS On this format.!ist the sverage daily unit power level in MWe-Net for each day ir. the reporting month. Compute to the nearest whole rnegswatt.

e OF)

Q, l

,r,-y-., - - -

---.-s

--+--v-,.

-y

-,e,-%

~.- - - = *

-*+--%e--w.=--.<-e------

=-

-====-r-e

    • -r=-w-e'e-

-+=- = - *

-* = * ' -*-

i I

s UNIT SilulDOWNS AND POWER REDUCllONS DOCKET NO.

50-364 UNIT NAME

.1.M.

Farley - Unit'2 DATE 12/1/80 COMPLETED 8Y E.G. liairston. III REPORT MONTil November. 1980 TELEPif0NE (205)899-5156 re.

E

=

re 3 r.a 55 9$h E ICCH5CC h1 Cause & Ongrective

~c u

g3d'C i

eE a

2 5 a:

Event t; T d

Adion to g$ 5 5

jdig Repost #

iN 0 0

H Pseveni Recurrence t5 Rece. ved Operatio g Lit ense 10/ 23/80 Init tal core load

>roj ec t ed for Jai uary 10, 1981.

Y i

_.3 g 3.-

u 5$Y 3

Ok is-aS YJ.

~

W b

I 2

3 4

10 Foiced

teason:

Method:

Exinbit G. Instructions S: Scheduled A-Equipnient Failure (Explain) l Manual for Psepasatiini of Data B-Maintenance oi Test 2-Manual Sesain.

Entry Sheets for 1.ieensee C Refueling 3 Automatic Scram.

Event Repost (EER) File INtIREG-D-Regulato y itesisiction 4-Othes (Explain) 0161)

E Operator Tsaining & 1icense I xamination F-Adnunisuative 5

G-Opesational Enos (lixplain)

E xhib I I - Same Somcc 19/77) ll Other (Explain)

- -..