ML19343B249

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1980
ML19343B249
Person / Time
Site: Farley 
Issue date: 12/10/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19343B250 List:
References
NUDOCS 8012160398
Download: ML19343B249 (1)


Text

-

Al b:ma Power Company 600 N;iin 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telepnone 205 250-1000 m

F. L CLAYTON, JR.

Senior Vice President Alabama Power the southem electnc system December 10, 1980 Docket No. 50-364 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthlv Operating Data keport Attached are two (2) copies of the November,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative SummarJ of Operating Experience" is 1.acluded in the attached report.

If you have any questions, please advise.

Yours very truly, u.s_, A e.?

' %J.T F. L. Clayton,rJr.

FLCJr/JRC:bhj Attachments cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) t}

n:

a C

F01 M 603'/R g

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 l

FARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1980 r

I i

Alabama Power Company's Joseph M. Farley Nuclear Plant, Unit 2 received its Operating License (O. L.) on 10/23/80.

The projected date for initial core load is January 10, 1981.

l

+

e.

-,, -- -.. ~,

g-

,,,,nn.-en-,--

.n---..

..w~

--,---,-v..

,,-,-,-,n----,-,-,,nn,

---,,r--

e--

e w