ML19343B195

From kanterella
Jump to navigation Jump to search
Forwards LER 80-153/03L-0
Date released: 12/23/2019 Download: ML19343B195


LER 80-153/03L-0:on 801107,during Cold Shutdown,Test of Reactor Core Isolation Cooling Turbine Exhaust Isolation Valve 2ES1-F040 Revealed That Leakage Exceeded 10CFR50,App J Acceptance Criteria.Caused by Scratches on Valve Seat
ML19343B201
Person / Time
Site: Hatch 
Issue date: 12/05/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343B201 (2)
Forwards LER 80-153/03L-0
ML19343B194
Person / Time
Site: Hatch 
Issue date: 12/05/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343B194 (1)