Confirms 801119 Meeting Re Resumption of Preoperational & Related Const Tests,Under Mutually Agreed Upon Controls. Lists Points of Understanding.Addl Controls Will Be Applicable to Other Plants Owned by Util
ML19343B163
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/20/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8012150020
Download: ML19343B163 (2)


Text

_

m

  1. o

~g UNITED STATES NUCLEAR REGULATORY COMMISSION o

U I

REGION 11 e

k Q ! is>p '31m3,@0N 101 MARIETTA ST., N W., SulTE 3100

. c..,o/

,:Un tNS Uht4 g

ATL ANTA, GEORGI A 30303 In Reply Refer To:

NOV 2 01980 RII:FSC 1 0 NOV N W9M 50-328 e e

,7 w c,v!:Es Tennessee Valley Authority ATTN:

H. G. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

Subject:

Confinnation of Concurrence This letter refers to the meeting in this office on November 19, 1980, with L. M. Hills and others of your staff reaarding preoperational and related construction tests at Sequoyah Unit 2.

Based on our discussions, we concurred in the resumption of these tests at Sequoyah 2 under the controls discussed in the meeting. This concurrence included the following understandings:

1.

Each of the remaining hydro test procedures will be subjected to a peer technical review before being approved by the Construction Engineer, and that the Construction QA Unit will review the entire test package for conformance with QA program requirements.

2.

Cleaning and flushing procedures will be reviewed by the Nuclear Power personnel in addition to the above reviews.

l 3.

TVA will review completed component and system tests to assure that appropriate test requirements have been met to support the preoperational test program.

l 4.

Construction or Nuclear Power QA Units will perform test observation and audits on a selected bases.

We also understand that you will apply these additional controls to your other i

nuclear power plants under construction.

'f your understanding of this concurrence is different than stated above, i

please contact this office ininediately.

(

Sincerely, l'

t J. O' ames P. O'Reilly irector cc: See Page 2 80121500 0 Q

=

t, Tennessee Valley Authority NOV 2 01980 cc:

G. G. Stack, Project Manager J. M. Ballentine Plant Superintendent J. F. Cox Supervisor, Nuclear Licensing Section M. J. Burzynski Project Engineer H..N. Culver, Chief Nuclear Safety Review Staff 1