ML19343B132

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Summary & NIS-1 Data Rept for Spring/Summer 1980 Outage. Includes Results of Weld & Pipe Support Exams & Inservice Insp of Reactor Pressure Vessel Internals,Core Spray Sparger & Jet Pump Beams
ML19343B132
Person / Time
Site: FitzPatrick 
Issue date: 12/05/1980
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19343B133 List:
References
JPN-80-56, NUDOCS 8012100224
Download: ML19343B132 (1)


Text

-

l I

POWER AUTHORITY OF THE STATE OF NEW YORK to CoLUMeus CIRCLE NEW YORK. N. Y. loo 19 t2121 397 6200 GEORGET SERRY

==<sicant a cuiar cremattaa OFrican TRUSTEES JOHNW.BC37CN JCMN 5 3YSON ass a mac'og o =-= = o = ria.

atoR E u. iN.AL. S JCSEPM R. SCHMIEDER w lC E CMai4 M AN EXECU'lVE VtCE

- y RICH ARD M FLYNN t CENT 6 OMtEP RCBERT1. MILLQNZ)

LERCY W. SINCLAIR sawca VICE *4t ss CENT

,REoERic.c R. cuRic December 5, 1980

-,,c;;gr,n ~ cia' JPN-80-56

~

Director of Nuclear Peactor Regulation U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Thomas A.

Ippolito, Chie.

~._

Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. Fit: Patrick Nuclear Power Plant Docket No. 50-333 Inservice Inspection Summary Report

Dear Sir:

This submittal consist of 5 copies of the James A.

Fit: Patrick Inservice Inspection Summary Report for the Spring /

Summer 1980 outage.

The report contains two major items of work:

1) the results of the component, weld and pipe support examinations conducted in accordance with the James A. Fitz-Patrick Inservice Inspection Program, and 2) the results of the inservice inspection of the reactor pressure vessel in-ternals, core spray sparger, and jet pump beams.

All results are acceptable in accordance with the ASME Code,Section XI.

The report has been reviewed by Authority personnel and the authorized inspector from Hartford Steam Boiler Inspection and Insurance Company.

The approval of both plant management and the authorized inspector is shown on the NIS-1 l

data form.

Very truly yours, bl'q.,

f/

,A m%.[ N B

\\

J.,_

avne ;

Senior Vice President

\\

~

l l

"duclear Generation

  • y' g. '

F(

9 l

(fv W

J W

6 0 a 210 022%

g @+#

Q

-