t rossamwreu
~
PART 21 IDBRIFICATION NO
%-ies-oot COPPANY NEM.W D4TE 0: L M u\\ul*o D00(ET NO. Do -2ket; I}e -
D4TE DISTRIBUTED nMto 9 m-ORIGIRAL EPORT StPPLDENTARY 1 DISTRIBUTION-1 n
EACTOR. (R) y FLEL CYCLE &
SAFEGilARDS(S$
IE FILES
[A M E D
b If IE FILES.
Icm2 IEFILES AD/SGiSF 25 tt4 a
m an'Pa AD/FFFBI AD/RDIid E
5
.u) o EGI0iG I,II,III,IV,V EGIONS I,II,III,IV,V REGIONSI,II,III,IV,V C
VSO3R BR. R-IV
\\dO3R BR. R-IV VB00R BR. R-IV LDEB / IPA MG 5715 IMS / FCFS SS-395 NRR/D3L EOD NG 76T LOEB / BPA MG 5715 IM S / SG SS-881 NRR/DJE EDD MG 7602 LDEB / I'PA MG 5715 NRR/DSI ASLBP E/W 4 50 AEOD M G 7602 MT SAD /SP MG-7210A ASLBP E/W 450 NRR/D3L CEhTRAL FILES 016 CBHRALFILES 016 ASLBP E/W 450 CBUR E FI S ('G RON)
CBERAL FILES (GR0iG CSERALFILES 016 PDR CBHRALFILES SS-395 CBURol FILES (GRON)
LPDR PDR PDR TEPA LPDR LPDR TERA 6
ACTION:
PRELIMItWlY EVALUATION OF THE' ATTACHED REPORT ItOICATES LEAD RESPONSIBILITY FOR FO'.LOWJP AS SH3hN BELOW:
3 NRR2 IMS OTHER mi-Et6 8/1/80 Pa'. M so FRsi l
80112, o43R
.c
-ggl -.
- ~ - - -
w w Utw
{
550 85:MAv2nve P.O. B:x 2161 Onktnc. C-Rornia 94621 (415) 577-74t0 C
41!!
N2C PcA NTD M-to~~4th-0C1 November 11, 1980 60- hi t.h g Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Coc=ission Washington, D.C.
20555
Dear Sir:
Please refer to Transamerica Delaval's letter of September 19, 1980.
In this letter a report of a potential defect in a component of the DSRV standby diesel generator was reported, as required by 10CFR21.
Due to site conditions the schedule for inspection which we recommend-ed in the September 19 letter has not been =et.
All of the sites are in various stages of construction which _akes it impractical to open up the engines for this inspection.
At every site we will have Service Engineers present for a considerable time witnessing all the final detailed installation and pre-start check-ing.
During this period the inspeciton vill be completed. Any replace-cent parts required will.be installed before any units are started. We have a written procedure, SIM No. 349, detailing the link rod inspection procedure.
This procedure will be cade part of the pre-start procedure for all the sites involved.
At the. ne site which is in an operating condition (Southern California Edison, San Onofre) the inspection was perforced September 20 and September 22.
The engines were found to be satisfactory.
A copy of Southern California Edision's letter ef October 9, 1980 report-ing this inspection is attached.
Sihdbrely, 1
xWm
/: llw(M D. Nartini Vice President and General Manager Transamerica Delaval,Inc.
DM/ds Enc: (1) cc; R.C. Haynes Nuclear Regulatory Commission 1990 N. California Blvd.
~
Walnut Creek, CA 94596-g a
To all affected sites (11) e6M o MU U A lfts
o Southbrn California Edison Company
_t;;CE o~... ~ u C L.... E ~.., ~. v. vi o-
......u.
. AN C LEMEN TE. C A LironM a 32 t '2 October 9, 1980 Enclosure (2)-
.4 Transamerica DeLaval Inc.
Engine & Compressor Division i
Post Office Box 2161
)
Oakland, California 94621 Attention:
Mr. John Wilder Engineer Customer Service
Subject:
Engine S/N 75041/42 Gentlemen:
This communication is in response to your letter dated Septem-ber 22,1980.
On September 18, 1980, we were informed by telephone through Mr. Hartwick of a potential 10 CFR 21 problem with our two standby diesel generators.
On September 20 and 22 your Mr. Lindstrom, assisted by station personnel made the prescribed inspection of our generator engines and they were found to, be in good working order..
4 If any more inferm7. tion is required; please do not hesitate to call.
Very truly yours,
k C.
R. R. Brunet No. 1 Unit Superintendent RRB/ap
Enclosure:
-Copies of Service Representative Inspection Report t