Forwards IE Insp Rept 50-370/80-14 on 800903-05.No Noncompliance Noted
ML19343A750
Person / Time
Site: Mcguire
Issue date: 10/09/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19343A748 List:
References
NUDOCS 8011210158
Download: ML19343A750 (2)


See also: IR 05000370/1980014

Text

,

- [".d[

'o,,

UNITED STATES

8

$

I

~

NUCLEAR REGULATORY COMMISSION

o

REGION 11

Ca

101 MARIETTA ST., N.W., SUITE 3100

,

f * *"*

ATLANTA, GEORGI A 30303

V

0CT 0 91980

In Reply Refer.To:

,

RII:CRMcF

50-370/80-14

Duke Power Company

ATTN:

W. O. Parker, Jr.

-

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

September 3 through 5,1980 of activities authorized by NRC Construction Permit

No. CPPR-84 for the McGuire facility, and to the discussion of our findings held

with J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspectioc.-and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

_

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. -These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Co.ie of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make _ a written application within 20 days to this office to

withhold such information from public disclosure. Any such application mast

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this ~ regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

'

,

them with you.

.

Sincerely,

1

'

C. E. Murph , hie

-

Reactor Construction and Engineering

Support Branch

4

Enclosure:

See Page 2~

'801121 o.f Sg

. .

.

..

~.

. - - -

-

-

- .--

+ , , ,

-

- - - - .

.

,-

,

-s.---+

. - - -

e-

n

,

-3-,

. .

--n

-

-r

.

O

l

l

Duke Power Company

-2-

,

- 09 m

Enclosure:

Inspection Report No. 50-370/80-14

cc w/ enc 1:

M. D. McIntosh, Plant Manager

J._ C. Rogers, Project Manager

..