ML19343A613

From kanterella
Jump to navigation Jump to search
Schedule & Outline of 246th ACRS Meeting on 801009-11 in Washington,Dc
ML19343A613
Person / Time
Issue date: 09/30/1980
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-MS-0603, ACRS-MS-603, NUDOCS 8011190141
Download: ML19343A613 (4)


Text

M5 - o 6o3 J

p %'o,

'j NUCLEAR REGULATORY COMMISSION hf2 ffhf UNITES STATES g

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS I

a

'o, f

W ASMNGTON, D. C. 20655

'%... '. /

September 30, 1980 SCHEDULE AND OUTLINE FOR DISCUSSION 246TH ACRS MEETING OCTOBER 9-11, 1980 WASHINGTON, DC Thursday, October 9, 1980, Room 1046, 1717 H Street, NW, Washington, DC 1) 8:30 A.M. - 9:30 A.M.

Opening Session (0 pen / Closed) 1.1) ACRS Chairman's Report (MWL/RFF) 1.1-1) Report of ACRS consultant (D. Gregory) and NRC ac-tion regarding Sequoyah Nuclear Plant 1.1-2) Commissioners' reaction to t.

ACRS comments regarding new a

C Construction Permits

~

C 9

1.1-3) Assignment of ACRS Nomin-ating Panel

'~ '~

1.1-4)

Items for meeting with e

Chairman, Nuclear Safety M

Oversight Committee 1.1-4-1) Strengthen ACRS role y

in the regulatory process 1.1-5)

Items for meeting with NRC Chainnan and Commissioners 1.1 1 ) Anticipated Transients Without Scram (ATWS) 1.1-5-2)

Implementation of ACRS comments on Unresolved Safety Issues 1.1 3 ) NRC Staff use of probabilistic as-sessment in sel-ected cases 1.1-5-4) Coordination /in-tegration of pro-gram for disposal of radioactive wastes with programs for disposal of other toxic wastes 1.1-5-5) Proposed safety research budget for FY 1982 (Closed) 1.1-6) Status of new members (Closed)

(This session will be closed as necessary to discuss information the release of which would represent an unwarranted invasion of personal privacy and information the premature release of which might significantly frustrate imple-

    • "t**i " # P" P 5'd #9'"*# ***I

"'I 8011190 [ k

Schedule September 30, 1980 2) 9:30 A.M. - 11:30 A.M.

Meeting with Chairman, Nuclear Safety Oversight Comittee (0 pen) 2.1 ) Strengthening ACRS Role in the regulatory process

3) 11:30 A.M. - 1:00 P.M.

Quantitative Risk Criteria (0 pen) 3.1) Discuss proposed ACRS report to NRC (D0/GRQ) 1:00 P.M. - 2:00 P.M.

LUNCH 4) 2:00 P.M. - 3:00 P.M.

Cuantitative Risk Criteria (0 pen)

L.1) Discuss proposed AGR$ report to NRC (00/GRQ) 5)

3:00 P.M. - 4:00 P.M.

Meeting with NRC Chairman and other Comissioners who may be present (Open)

(Portions of this session may be closed as required to discuss information, the 4

premature release of which might sig-nificantly frustrate implementation of proposed agency action.)

6) 4:00 P.M. - 6:00 P.M.

Meeting with NRC Staff (0 pen) 6.1) Briefing regarding current status of Nuclear Data Link (WK/JB/RS) 7)

6:00 P.M. - 6:30 P.M.

Future Schedule (0 pen) 7.1) Meeting dates for CY 81 7.2) Anticipated Comittee activities 7.3) Anticipated Subcomittee activity i

Friday, October 10, 1980, Room 1046, 1717 H Street, NW, Washington, DC 8) 8:30 A.M. - 10:30 A.M.

Proposed NRC Rule Regarding Fire Protec-tion for Nuclear Facilities (0 pen) 8.1 ) 8:30 A.M. - 8:45 A.M.:

Report of Subcommittee Chairman (MB/JCM/GY) 8.2) 8:45 A.M. - 10:30 A.M.: Discus-sion witn representatives of the NRC Staff and the nuclear industry

a Schedule September 30, 1980

9) 10:30 A.M. - 12:00 Noon NRC Plan to Review Regulatory Requiremarts and Systematically Reevaluate Operating Nu' clear Plants (0 pen) 9.1 ) 10:30 A.M.-10:45 A.M.:

Report of ACRS Subete. Chairman (WMM/RXM) 9.2) 10:45 A.M.-1?:00 Noon: Briefing by MRC Staff 12:00 Noon - 1:00 P.M.

LUNCH 10) 1:00 P.M. - 2:00 P.M.

Meeting with NRC Staff Regarding Decay Heat Removal (0 pen) 10.1) 1:00 P.M.-1:15 P.M.:

Report of ACRS Subcommittee on Extreme Environmental Phenomena (00/RS) 10.2) 1:15 P.M.-2:00 P.M.:

Briefing regard-ing NRC Staff action to review seismic design of auxiliary feedwater systems 11) 2:00 P.M. - 5:00 P.M.

Quantitative Risk Criteria (0 pen) -

11.1) Discuss proposed ACRS report to NRC (00/GRQ) 12) 5:00 P.M. - 6:30 P.M.

Discuss Proposed ACRS Reports / Letters on:

(0 pen) 12.1) Design of BWR Scram Systems (MSP/AB/PAB) 12.2) NRC Requirenents Regarding Inspec-tion of Primary System Pressure Boundary (PS/EI)

Saturday, October 11, 1980, Room 1046, 1717 H Street, NW, Washington, DC ll 13) 8:30 A.M. - 12:00 P.M.

Discuss proposed ACRS reports on:

(0 pen) 13.1) 8:30 A.M.-10:30 A.M.:

Quanti-tative Risk Criteria (00/GRQ) 13.2) 10:30 A.M.-11:30 A.M.:

NRC Fire Protection Fale (10 CFR Part 50)

(MB/GY) 13.3) 11:30 A.M.-12:00 Noon: Review of regulatory requirements and reevaluation of operating nuclear plants (WMM/RKM) 12:00 Noon - 1:00 P.M.

LUNCH

4 Schedul e September 30, 1980

14) 1:00 P.M. - 1:30 P.M.

Discuss OPE /0GC Proposal Re. Strengthen-ing ACRS Role in the Licensing Process (0 pen)

15) 1:30 P.M. - 2:30 P.M.

Discuss Proposed ACRS Positions / Comments on:

(0 pen) 13.1) Nuclear Data Link 15.2) Auxiliary feed systems, seismic 4

design i

16) 2:30 P.M. - 3:30 P.M.

Reports of ACRS Subcommittees on:

(0 pen) 16.1) RSR Report to Congress for FY 1982 (CPS /SD) 16.2) Diablo Canyon Nuclear Plant, sys-tems interaction studies (00/RS) 16.3) Advanced reactors (MWC/RS) 16.4) Waste Confidence Proceeding and Criteria for Geologic Waste Dis-j posal (SL/GY) 17) 3:30 P.M. - 4:00 P.M.

Miscellaneous (0 pen) 17 1) Clarification of ACRS Report on ATWS(WK/PAB) 4 l

i h

_