ML19343A536

From kanterella
Jump to navigation Jump to search
Submits Proposed Change 139 to Tech Specs,Responding to NRC Comments Re Tech Specs Format & Status, & Cancelling Proposed Change 112
ML19343A536
Person / Time
Site: Yankee Rowe
Issue date: 05/27/1976
From: Johnson W
YANKEE ATOMIC ELECTRIC CO.
To:
Office of Nuclear Reactor Regulation
References
WYR-76-62, NUDOCS 8011140565
Download: ML19343A536 (3)


Text

( Pr:poIed Chang) No. 139

(....

Tzlephone 617 366-9011 m

"" ~'*

YANKEE ATOMIC ELECTRIC COMPANY

~.

W 20 Turnpike Road Westborough, Massachusetts 01581

.Yauxsi:

May 27, 1976

_ :p 3

SEch;gg&

IN( Jutt Jg7g {%

United States Nuclear Regulatory Commission t

2 Washington, D. C.

20555 5

L, on D

Attention: Office of Nuclear Reactor Regulation Of

Reference:

License No. DPR-3 (Docket No. 50-29)

/

j

Dear Sir:

Pursuant to Section 50.59 of the Commission's Rules and Regulations Yankee Atomic Electric Company hereby proposes the following Amendment to the Facility License.

PROPOSED CHANGE: Reference is made to Appendix "A" Technical Specifications appended to the facility license. Enclosed find Technical Specifications rewritten into the Westinghouse Standard Technical Specification format dated October 1, 1975.

REASON FOR CHANGE: This Proposed Change is responsive to the nuclear Regulatory Commission's comments relative to the format and status of the present Technical Specifications. This Change also serves to cancel our Proposed Change No. 112, submitted January 3, 1974 covering the same subject.

SAFETY CONSIDERATIONS: This change is safety related and incorporates the results of our staff's discussion on all specifications. This change has been reviewed by the Nuclear Safety Audit and Review Committee.

SCHEDULE OF CHANGE:

It is requested that this Proposed Change become effective six months after official notification of Commission approval.

The change requires extensive procedure revision and personnel training.

Immediately following notification of approval by the Commission, the required revisions and training will commence.

In the interim period the present Technical Specifications shall govern the licensed activities of the plant.

As, plant procedures are revised and approved, they will be

, i:J l

/~^-

0 ~

\\

/

8011u.o 56 p

.a

(-

(

~

. =. ~

-

  • United. Stit0c Nuclear Regulatory Commiccion May 27, 1976 Attn Office of Nuclear Reactor Regulation Page Two immediately implemented once it is determined that prepar adherence to these procedures will not cause a violation of present license require-ments. All necessary training activities and procedure revisions shall be completed no later than the effective date of this change.

We trust you v'.11 find this information satisfactory; however, should you require additional information, feel free to contact us.

Very truly yours,

" YANKEE A'IOMIC ELECTRIC COMPAL W.

. Johnson Vi e President REMR/kg COMMONWEALTH OF MASSACHUSETTS)

)ss.

COUNTY OF WORCESTER

)

Then personally appeared before me, W. P. Johnson, who being duly sworn did state that he is.Vice President of 1, Utee Atomic Electric Company, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Yankee Atomic Electric Company, and that the statements therein are true to the best of his knowledge and belief.

W R

Armand R. Soucy Notary Public My Comtaission Expires September 9,1977 I

NRC Kc. A 195

/

U.L NUCLE AR REOULATOR/.4MMl3SION SOCKET NUM EG L_ _

L--

60-E9 n m8 N,RC DISTRIB'UTION Fce PART 50 DOCKET lt1ATERI AL. ~

To: NEC FROM: Yankee Atomic Elec Co DATE oF DOCUMENT ~

  • Westborough, Mass 5-27-76 W P Johnson DATE RECEtVED 6-1-76 SLETTER ONoToR 2ED PHOP INPUT FORM NUMBER OF COPIES RECEtVED ConsciNAL BUNCLASSIFIED OCoPY 3 gggggj DESCRIPTION ENCLoSU R E Ltr notarized 5-27-76.......trans the follow:

Andt to OL/ Change to Tech Specs.f139: consisto of revision to Appendix A with regard to West-inghouse Standardized Tech Specs............

(40 cys enc 1 rec'd)

,6 [G PLANT NAME: Yankee Rowe FOR ACTION!:l!FOR:.1ATION 6-2-76 ehf I

ASSIG:TED AD:

ASSIONED AD:

[LH/CICH CHIEF:

Pvfj/m (f)

FRAi!CH CHIEF:

/

PROJECT !?ANAGER:

p, pp f

PROJECT ?"ANAGER:

/

LIC. ASST.:

$ g p,- c /

LiC. ASST.:

I I

i

%l INTERNAL DISTRIBUTION i

~ ' " ~ ~

l 5?STES SATETY FLAliT SYSTE:S EIFTIPO TECH

_ _.I 3 0 E R HEINEIAN T EESCO EPEST i

/

ILE(M SOFROITh.,

S!AROYA PALLAFD

-l

/ OTLD TE UAs crn ",T p i

/

COSSICK & STAF~'

E'!3 Int. atING IPPOLTTO ICPC 1:CCAFY SITE TECH OPERATING FEXCIORS G!dOIILL CASE 12TTGHT

~STELIU STER?

uAHyr g cihhib 1rART,ESS PAWLICKI HUL'/.AN OPERATIU3 TECH PROEC? 73fd: AGE'T!T F5 ACTOR SAFEfY

/

EISEUHUT SITE AHALYSIS i

IovD ROSS

/

EHA0 VOLL:ER

(

P COLL!!!S NOVAK

/

EAER BUNCH EOUSO3:7 ROSZ'IOCZY

/

SCHWENCER J. COLLIIiS

.- PEESO::

CHECK

/

GRI!ES KREJER I

TELTZ HEL'TE 2S AT & I SITE SAFETY & ENVIRO

~~~SKOV?OLT SALTZ:IAN ANAIllSIS RyrEERG DETION & KJIJER j

EXTERNAL DISTRIBUTION CONTROL NUMBER a

[@ ;hf_c.,b.II, /74y & I!ATL IAE 2SOOKUAVE' NAIL IKe I

mm RE3. V-IE ULRIKSON (ORNL) i/~f5Sd~

]/

t/

IA PDR

(_

CONSULT! M m n m

((ASLE. f[E^ LEI:W M 9 ri D 4 d h Td

.h F.i Li H fi flB II & E B

{

Adi'5 t

w nupto n n w r no u n m n te S du 6% j;jyg

    • Od
nC r cir,v m :.x,